Demo Worksheet Cont'd
<br />Task # TTT
<br />Page 17 of 19
<br />CIRCES Cost Estimating Software
<br />10,000 ft. haul
<br />PR -4 conveyor
<br />200x350 if
<br />Conveyor, overland,
<br />including supports - 8
<br />ft. W x 10 ft. H housing
<br />350.00
<br />LF
<br />$25.36
<br />$8,876.00
<br />TC- 1/PR -2 transfer
<br />tower & scalping sta.
<br />40xx20x50
<br />Bldg. (MN) demo. /on-
<br />site disposal in
<br />excavated pit - Max.
<br />10,000 ft. haul
<br />40,000.00
<br />CF
<br />$0.21
<br />$8,440.00
<br />- Foundation
<br />40x20x1
<br />Demo. and on -site
<br />disposal in excavated
<br />pit, 12 in. thick - Max.
<br />200 ft. push
<br />800.00
<br />SF
<br />$3.22
<br />$2,576.00
<br />R -5 conveyor
<br />extension in reclaim
<br />tunnel
<br />8x200 if
<br />Conveyor, elevated,
<br />including supports - 5
<br />ft. W x 6 ft. H housing
<br />200.00
<br />LF
<br />$42.26
<br />$8,452.00
<br />P3/P5 conveyor
<br />10x950 if
<br />Conveyor, overland,
<br />including supports - 8
<br />ft. W x 10 ft. H housing
<br />950.00
<br />LF
<br />$25.36
<br />$24,092.00
<br />-Bent foundations
<br />45x2x4
<br />Demo. and on -site
<br />disposal in excavated
<br />pit, 12 in. thick - Max.
<br />200 ft. push
<br />360.00
<br />SF
<br />$3.22
<br />$1,159.20
<br />R -5 conveyor reclaim
<br />tunnel walls
<br />600x10x1.5
<br />Pavement, concrete,
<br />demolition only, 7 in. to
<br />24 in. thick - Reinforced
<br />333.00
<br />CY
<br />$112.00
<br />$37,296.00
<br />-Floor and roof
<br />600x20x2
<br />Pavement, concrete,
<br />demolition only, 7 in. to
<br />24 in. thick - Reinforced
<br />889.00
<br />CY
<br />$112.00
<br />$99,568.00
<br />Coal prep. plant
<br />electric trans. line
<br />1800 if
<br />Powerline or utility line,
<br />overhead, wood -
<br />Double or "H" pole
<br />1,800.00
<br />LF
<br />$5.23
<br />$9,410.40
<br />Coal prep. plant -
<br />Structure
<br />109x40x148
<br />Plant (3S) demo. /on -site
<br />disposal in excavated
<br />pit - Max. 10,000 ft.
<br />haul
<br />645,280.00
<br />CF
<br />$0.21
<br />$132,282.40
<br />-Floor
<br />84x112x2
<br />Demo. and on -site
<br />disposal in excavated
<br />pit, 12 in. thick - Max.
<br />200 ft. push
<br />9,408.00
<br />SF
<br />$3.22
<br />$30,293.76
<br />- Footers
<br />lx2x308 If
<br />Demo. and on -site
<br />disposal in excavated
<br />pit, 1.0 ft. x 2 ft. - Max.
<br />200 ft. push
<br />616.00
<br />LF
<br />$6.43
<br />$3,960.88
<br />-Water supply line
<br />2300x 8 in
<br />Pipe, sewer /water - 12
<br />in. diameter pipe
<br />2,300.00
<br />LF
<br />$6.36
<br />$14,635.13
<br />-Water discharge line
<br />300x 12 in
<br />diam
<br />Pipe, sewer /water - 12
<br />in. diameter pipe
<br />300.00
<br />LF
<br />$6.36
<br />$1,908.93
<br />Control/lab building -
<br />Superstructure
<br />50x40x30
<br />Bldg. (SN) demo. /on-
<br />site disposal in
<br />excavated pit - Max.
<br />10,000 ft. haul
<br />60,000.00
<br />CF
<br />$0.18
<br />$10,980.00
<br />-Floor
<br />42x52x12 in
<br />Floor, concrete,
<br />demolition only,
<br />average reinforcing - 12
<br />in. thick
<br />2,184.00
<br />SF
<br />$3.10
<br />$6,770.40
<br />- Footers
<br />lx2x308 if
<br />Demo. and on -site
<br />disposal in excavated
<br />pit, 1.0 ft. x 2 ft. - Max.
<br />200 ft. push
<br />308.00
<br />LF
<br />$6.43
<br />$1,980.44
<br />Demo Worksheet Cont'd
<br />Task # TTT
<br />Page 17 of 19
<br />CIRCES Cost Estimating Software