Laserfiche WebLink
COAL BASIN MINE/FACILITIES AREA RECLAMATION PROJECT <br /> REVISED BID SCHEDULE <br /> PKA-0-449 <br /> Item Description Qty. Unit Unit Price Amount <br /> 1 Mobilization/Demobilization N/A Job N/A $ ),00O <br /> 2 Demolition N/A Job N/A $ a,SV1) <br /> 3 Culvert Removal N/A Job N/A $ <br /> 4 Road Grading <br /> B Lower Sutey Access Road <br /> Segment 1 950 Ln. Ft. $_3.`v $ <br /> Segment 2 950 Ln. Ft. $ 384� <br /> C Belt Line Transfer Road 450 Ln. Ft. $ 3 $ �35� <br /> c� <br /> D North West Sutey Access Road 300 Ln. Ft. $ 3. $ Q 00 <br /> E Road A 5,800 Ln. Ft. 1$ $ QL101D <br /> 5 Rolled Dip Construction 2 Dip $ $ 0 <br /> 6 Low Water Crossing 2 Crossing $ ).Oo0 $ M <br /> 7 Surface Channels <br /> A Old Coal Storage Area 150 Feet $ 0 $ � <br /> B Rock Dump Channel 350 Feet $ Q0 $ <br /> 8 Earth Work N/A Job N/A $ <br /> 9 Topsoil Application and Surface <br /> Roughening N/A Job N/A $ 3�155 <br /> 10 Revegetation 15.6 Acre $ I, aoo $ <br /> 11 Post Construction Sediment <br /> Control 1,000 Ln. Ft. $ QW 0 <br /> 12 Equipment Rental <br /> A Dozer 24 Hour $ h70 $ aLlJo <br /> B Backhoe 24 Hour $ $ ) 0O <br /> C End Dump Truck 16 Hour $ �J� $ ROO <br /> GRAND TOTAL $ I <br /> THIS BID SCHEDULE MUST BE RETURNED WITH YOUR BID <br /> Page 1 of 1 Page <br />