My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1995-10-13_GENERAL DOCUMENTS - C1981017
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
1995-10-13_GENERAL DOCUMENTS - C1981017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2021 5:18:54 PM
Creation date
6/8/2012 1:16:02 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
10/13/1995
Doc Name
Bid Documents (IMP)
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Measurement and Payment <br /> Sediment containment fences will be measured to the nearest linear foot. Payment for this <br /> task will be paid for at prices established in Task 2 of the Bid Schedule per linear foot <br /> installed. Such payment shall be considered full compensation for all labor, materials, <br /> equipment and all other items necessary and incidental to the furnishing and placement of the <br /> Sediment containment fences as directed and described in the specifications. Payment will <br /> be as this task is completed and approved by the PROJECT MANAGER. Payment for this task <br /> will be made only for the unit price shown under Task 2 of the Bid Schedule. <br /> TASK 3 EARTHWORK <br /> There are two overall objectives of the earthwork task. The first is to ensure that the <br /> appropriate landform is achieved by accomplishing final grading at the two refuse facilities. <br /> The second objective is to place soil medium on the refuse facilities in order to encourage <br /> adequate revegetation of these sites. Following construction of the final grades, each refuse <br /> facility will have topsoil replaced upon it to facilitate revegetation. Task 3 is divided into two <br /> sub-asks: Task 3a, Sutey Pile Grading and Topsoil Placement and Task 3b, Old Refuse Pile <br /> Grading and Topsoiling. <br /> Sutey Pile Grading and Topsoil Placement <br /> Final grading of the Sutey Refuse Disposal Facility (Sutey Pile) will be accomplished as a result <br /> of this task (Map 4, Sutey Refuse Disposal Facility). This will involve grading a series of <br /> existing benches located near the upper portion and the south eastern portion of the pile so <br /> that the benches are eliminated and so that these areas blend with the rest of the pile. Final <br /> grading will also accomplish burial of existing conveyor foundations located on the refuse <br /> facility by a minimum of four (4) feet of cover. However, foundations located at the top of <br /> the facility and others located immediately above the top of Ditch 8 must be removed from <br /> their current locations to a depth of three (3) feet. The foundation debris and rubble may be <br /> buried on site by a minimum of four (4) feet of cover during grading operations. <br /> Concurrent with final grading operations, a number of drainage ditches will be constructed on <br /> the Sutey Refuse Disposal Facility to route drainage from the surface of the pile. These <br /> drainage ditches are described, and will be paid for under Task 4, Surface Drainages. <br /> Topsoil will be placed upon the Sutey Refuse Facility. Approximately 36,000 cubic yards of <br /> topsoil material will be spread evenly over approximately 13.1 acres at the disposal facility <br /> to an average thickness of 20 inches. The topsoil will be derived from two adjacent topsoil <br /> stockpiles. Compaction will be accomplished up and down slopes so that the track-machine <br /> grouser marks are parallel to the contour. <br /> Old Refuse Pile Grading and Topsoil Placement <br /> Portions of the Old Refuse Pile have previously been reclaimed. Approximately five (5) acres <br /> of the pile still need to be reclaimed (Map 5, Old Refuse Pile). Reclamation work will be <br /> conducted in a manner which minimizes disturbance to the previously-reclaimed portions of <br /> the facility. Grading of the Old Refuse Pile will occur in the vicinity of the refuse conveyor <br /> in order to blend this area with the surrounding portions of the pile. The majority of the <br /> grading will occur on the lower portion of the pile in the area of the conveyor. <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.