My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1995-10-13_GENERAL DOCUMENTS - C1981017
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
1995-10-13_GENERAL DOCUMENTS - C1981017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2021 5:18:54 PM
Creation date
6/8/2012 1:16:02 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
10/13/1995
Doc Name
Bid Documents (IMP)
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT WORK DESCRIPTION <br /> PROJECT OVERVIEW <br /> The goal of this project is to accomplish reclamation of two waste disposal facilities, the <br /> Sutey Pile and the Old Refuse Pile (Map 3, Mine Plan Map). The Sutey and Old Refuse Piles <br /> consist of coal refuse derived from the washing of coal. Portions of each facility have been <br /> previously reclaimed. This project will achieve final reclamation at each facility by <br /> accomplishing some grading work of the disposal areas, application of topsoil, construction <br /> of drainages, and revegetation. <br /> The Coal Basin Sutey Pile and Old Refuse Pile Reclamation Project includes the following <br /> tasks: <br /> Task 1 : Mobilization and Demobilization <br /> Task 2: Silt Fence <br /> Task 3: Earth Work <br /> Task 4: Surface Drainage <br /> Task 5: Equipment Rental <br /> Task 6: Revegetation <br /> Task 7: Additional Silt Fence, if required <br /> TASK 1 MOBILIZATION AND DEMOBILIZATION <br /> This task shall comply with the attached specification 1 .0, Mobilization/Demobilization, <br /> attached. <br /> TASK 2 SILT FENCES <br /> Sediment containment fences will be Mirafi Prefabricated Silt Fence with Posts, or approved <br /> equivalent. Silt fence will be installed as per manufacturers specifications with 3 feet <br /> between posts, Silt fence will be placed at various locations to minimize the transportation <br /> of sediment from each disposal facility and will be paid for under Task 2. Placement of silt <br /> fencing will occur concurrently with grading operations. 1 ,100 feet of silt fence will be <br /> installed at the Sutey Refuse Disposal Area and 900 feet at the Old Refuse Pile. It may be <br /> necessary to install up to 800 additional feet of silt fencing, which will be paid under Task 7. <br /> The PROJECT MANAGER will notify the CONTRACTOR if additional silt fencing must be <br /> provided and installed. <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.