Laserfiche WebLink
PROJECT WORK DESCRIPTION <br /> Project Overview <br /> The goal of this project is to accomplish reclamation of the Mine 3 entry, the Intermediate <br /> Coal Transfer Area, and the Lower Bench Area. Mine 3 is located south of Mine 5, and drains <br /> to both Coal Creek and the North Fork of Dutch Creek. The Intermediate Coal Transfer Area <br /> and the Lower Bench Area are located east of the Mine 3 entry bench, and down slope from <br /> the bench (Map 3, Mine Plan Map). Mine 3 is approximately 4.5 miles from the main entry <br /> gate, and is accessed via Road F. <br /> This project will accomplish reclamation of the Mine 3 entry area through the demolition of <br /> concrete foundations, the removal of material from the mine bench outslopes and placement <br /> against the highwall. Reclamation of the Intermediate Coal Transfer Area and of the Lower <br /> Bench Area will consist of concrete demolition and disposal, excavation of material spoiled <br /> over the bench outslopes, and placement of this material against the highwalls. Additional <br /> grading work may be accomplished at these areas. All cut and fill areas, bench remnants and <br /> outslopes will be revegetated. <br /> Work Tasks <br /> The tasks included in the project are as follows: <br /> Task 1 : Mobilization and Demobilization <br /> Task 2: Demolition <br /> Task 3: Silt Fencing <br /> Task 4: Earthwork <br /> Task 5: Surface Drainage <br /> Task 6: Equipment Rental <br /> Task 7: Revegetation <br /> Task 8: Additional Surface Drainages <br /> Task 9: Additional Silt Fencing <br /> TASK 1 MOBILIZATION AND DEMOBILIZATION <br /> This task shall comply with Specification 1 .0, Mobilization/Demobilization, attached. <br /> TASK 2 DEMOLITION <br /> There are two overall objectives of the demolition task. The first is to demolish all concrete <br /> and block wall building remnants which remain at the Mine 3 entry area and remove the <br /> conveyor foundations between Mine 3 and the Lower Bench Area. The second is to place <br /> rubble produced by the demolition process against highwall remnants for burial. <br /> 6 <br />