foot was agreed upon. <br /> Bogue Construction was also directed to remove accumulated steel <br /> and miscellaneous junk adjacent to the concrete channel and to then <br /> construct an emergency channel . This was accomplished with the 850 <br /> dozer on June 9, 1995. <br /> On June 17, 1995 during heavy rains at the site, it was discovered <br /> that the sump which drains the eastern portion of the facilities <br /> area was blocked. Previous to this discovery, contact with Mid- <br /> Continent officials were unsuccessfully attempted. It was observed <br /> that the facilities area east of the main access road was becoming <br /> flooded and that the berm north west of the sump had partially <br /> breached. There was a concern that further rainfall would result <br /> in a serious breach of the containment berm with discharge <br /> reporting to Coal Creek. Bogue Construction was directed to open <br /> the clogged sump discharge pipe. This was initially attempted with <br /> the 690 backhoe, however it had to be diverted to maintain the <br /> cement channel. Subsequently, the 416 backhoe was utilized to open <br /> the discharge structure. <br /> C:\wp51\midc\maint\chngo <br />