Laserfiche WebLink
4. Objection by Mid - Continent to the recommendations may be filed within <br />30 days of receipt by Mid - Continent. Such objection shall be made in writing <br />to the Division. Such disagreements will be settled between the Division /USFS <br />and Mid - Continent, or may be subject to administrative and judicial review. <br />E. Final Reclamation Schedule <br />1. If the permit is not transferred to a successor permittee or the mine <br />is not otherwise reactivated, Mid - Continent shall initiate and complete <br />reclamation of the Coal Basin Mines and the Carbondale loadout site in <br />compliance with the following schedule: <br />a. January 15, 1992 <br />Mid - Continent will report to the Division as to its plan, including a <br />showing satisfactory to the Division of its capability to proceed <br />with final reclamation of the mine property commencing June 1, 1992. <br />b. May, 1992 - October, 1992 <br />Initiate and complete reclamation of Mine 1, 2, 3, 4, and 5 portal <br />areas, including portal sealing, structural demolition, backfilling <br />and grading, revegetation, and installation of sediment controls. <br />Also complete sealing of the adit/rock tunnel. Reclamation must <br />commence no later than June 1, 1992. <br />c. May, 1993 - October, 1993 <br />Complete reclamation of the adit /rock tunnel area, initiate and <br />complete reclamation of the preparation plant area, refuse areas, <br />roads, and conveyor facilities. Reclamation will entail facilities <br />demolition, backfilling and grading, topsoiling, and revegetation. <br />Roads will be decommissioned such that the post -mine land use <br />objectives will be served. The road surfaces and cut and fill slopes <br />will be stabilized to minimize erosion, and a low maintenance <br />drainage control system will be installed in place of the current <br />high maintenance system. <br />d. May, 1994 - October, 1994 <br />Initiate and complete reclamation of the Carbondale Rail Loadout. <br />Perform any necessary repairs, maintenance or follow -up work as <br />required at the Coal Basin mine site. <br />e. October, 1994 until Final Bond Release <br />Perform necessary drainage and sediment pond maintenance, <br />environmental monitoring and otherwise maintain the site in <br />compliance with all applicable statutes, regulations and permit <br />conditions until final bond release. <br />