My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1987-12-01_PERMIT FILE - C1981017 (304)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981017
>
1987-12-01_PERMIT FILE - C1981017 (304)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2021 7:24:03 AM
Creation date
6/7/2012 10:02:53 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
Permit File
Doc Date
12/1/1987
Doc Name
Water Control Plan Train Loadout Area
Section_Exhibit Name
Chapter VII Volume 9 Appendix VII-H-1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 10 of 19 <br /> PART II <br /> A. MANAGEi�vT REQUIREMENTS <br /> 1. Change in Discharge <br /> The permittee shall inform the Division (Permits and Enforcement <br /> Section) in writing of any intent to construct, install, or alter any <br /> process, facility, or activity that is likely to result in a new or <br /> altered discharge and shall furnish the Division such plans and <br /> specifications which the Division deems reasonably necessary to <br /> evaluate the effect on the discharge and receiving stream. <br /> The permittee shall submit this notice within two (2) weeks after <br /> making a determination to perform the type of activity referred to in <br /> the preceding paragraph. Process modifications include, but are not <br /> limited to, the introduction of any new pollutant not previously <br /> identified in the permit, or any other modifications which may result <br /> in a discharge of a quantity or quality different from that which was <br /> applied for. Following such notice, the permittee shall be required to <br /> submit a new CDPS application and the permit may be modified to specify <br /> and limit any pollutants not previously limited, if the new or altered <br /> discharge might be inconsistent with the conditions of the existing <br /> permit. In no case shay? the permittee implement such change without <br /> first notifying the Division. <br /> 2. SDecial Notifications - Definitions <br /> a) By The intentional diversion of waste streams from any <br /> portion of a treatment facility. <br /> b) Severe Property Damage: Substantial physical damage to property at <br /> the treatment facilities which causes them to become inoperable, or <br /> substantial and permanent loss of natural resources which can <br /> reasonably be expected to occur in the absence of a bypass. It <br /> does not mean economic loss caused by delays in production. <br /> c) Spill: An unintentional release of solid or liquid material which <br /> may cause pollution of state waters. <br /> d) Upset: An exceptional incident in which there is unintentional and <br /> temporary noncompliance with permit effluent limitations because of <br /> factors beyond the reasonable control of the permittee. An upset <br /> does not include noncompliance to the extent caused by operational <br /> error, improperly designed treatment facilities, inadequate <br /> treatment facilities, lack of preventive maintenance, or careless <br /> or improper operation. <br /> Code: i - 24 Date: 1 - 84 <br />
The URL can be used to link to this page
Your browser does not support the video tag.