My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1993-10-27_REVISION - M1977378 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977378
>
1993-10-27_REVISION - M1977378 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2021 12:37:17 PM
Creation date
6/5/2012 11:56:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
REVISION
Doc Date
10/27/1993
Doc Name
Notice of Hearing
From
DMG
To
Sunnyside Gold Corp
Type & Sequence
TR14
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Letter to Sunnyside Gold 2 October 27, 1993 <br /> UNDERGROUND WORKINGS, ARE REGARDED BY THE WATER QUALITY CONTROL <br /> DIVISION TO BE UNPERMITTED POINT SOURCE DISCHARGES. THE DIVISION <br /> OF MINERALS AND GEOLOGY UNDERSTANDS THAT THE OPERATOR DOES NOT <br /> AGREE WITH THIS INTERPRETATION BY THE WATER QUALITY CONTROL <br /> DIVISION. THE OPERATOR FURTHER UNDERSTANDS THAT ANY MEASURABLE <br /> CHANGE IN WATER QUALITY OR QUANTITY IN THE SEEPS OR THE DRAINAGES <br /> SURROUNDING THE MINE, i.e. CHANGES REPORTED BY THE OPERATOR IN <br /> CONJUNCTION WITH COMPLIANCE WITH THE APPROVED HYDROLOGIC MONITORING <br /> PLAN OR CHANGES REVEALED THRU DIVISION INSPECTIONS OF THE MINE, <br /> WILL BE CONSIDERED BY THE DIVISION AS POSSIBLE EVIDENCE OF THE <br /> DEVELOPMENT OF UNPERMITTED POINT SOURCE DISCHARGES RELATED TO THE <br /> INSTALLATION OF THE BULKHEADS. THEREFORE, SIGNIFICANT CHANGES IN <br /> WATER QUALITY OR QUANTITY IN THE SEEPS OR IN THE DRAINAGES <br /> SURROUNDING THE MINE, FOLLOWING THE INSTALLATION OF BULKHEAD SEALS <br /> IN THE UNDERGROUND WORKINGS, WILL BE CITED AS A POTENTIAL <br /> COMPLIANCE PROBLEM BY THE DIVISION AND THE OPERATOR WILL BE <br /> REQUIRED BY THE DIVISION TO CONTACT THE WATER QUALITY CONTROL <br /> DIVISION TO DETERMINE IF A NEW DISCHARGE PERMIT FOR THE MINE OR A <br /> MODIFICATION OF THE EXISTING DISCHARGE PERMIT FOR THE MINE IS <br /> NECESSARY. RESPONSIBILITY FOR ENFORCEMENT OF POTENTIAL DISCHARGE <br /> PERMIT COMPLIANCE PROBLEMS WILL REST WITH THE WATER QUALITY CONTROL <br /> DIVISION. <br /> COMMITMENT #2 <br /> THE OPERATOR WILL CREATE A SEPARATE SECTION IN EACH ANNUAL <br /> RECLAMATION REPORT THAT WILL INCLUDE DATA AND NARRATIVE TO <br /> DISSEMINATE INFORMATION FROM THE MONITORING PROGRAM REQUIRED BY THE <br /> TERMS OF TR-14. THE OPERATOR WILL NOTIFY THE DIVISION IMMEDIATELY <br /> IN THE CASE THAT TRACER IS DETECTED AT ANY POINT BY THE MONITORING <br /> PROGRAM, OR IF THERE IS INCREASED DISCHARGE TO ANY SURROUNDING <br /> DRAINAGE THAT MAY BE RELATED TO FLOODING OF THE SUNNYSIDE WORKINGS. <br /> COMMITMENT #3 <br /> THE OPERATOR WILL PROVIDE THE DIVISION WITH A DETAILED SUMMARY OF <br /> THE COSTS THAT WOULD BE INCURRED BY THE STATE TO INSTAL REPLACEMENT <br /> BULKHEADS IN THE EVENT OF PERMIT REVOCATION AND BOND FORFEITURE. <br /> A BOND, IN AN AMOUNT APPROVED BY THE DIVISION, MUST BE IN PLACE FOR <br /> BULKHEAD REPLACEMENT PRIOR TO CLOSING THE AMERICAN TUNNEL VALVE. <br /> COMMITMENT #4 <br /> THE OPERATOR WILL PROVIDE THE DIVISION WITH A PLAN TO CHARACTERIZE <br /> CONJUNCTIVE FLOW WITHIN THE CEMENT CREEK DRAINAGE IN THE VICINITY <br /> OF THE SUNNYSIDE MINE WITHIN 30 DAYS OF REVISION APPROVAL. <br /> A written explanation of the Division's recommendation to approve <br /> TR-14 is set forth in the following list: <br /> 1. Hydraulic bulkhead seals within the American and Terry Tunnels <br /> are included in the approved reclamation plan for the <br /> Sunnyside Mine. The approved plan required SGC to submit <br />
The URL can be used to link to this page
Your browser does not support the video tag.