Laserfiche WebLink
Responses to Division Concerns <br /> Page 14 <br /> 11. Ultimate Life of the Bulkheads - Cont 'd <br /> Increased leakage will be the warning signs under the most <br /> likely failure scenarios. Monitoring during the initial life <br /> of the bulkheads will provide assurance that the functional <br /> life is not being shortened by deterioration of the bulkhead <br /> airside. <br /> SGC believes that the above discussion addresses the concerns of <br /> the Division related to the American Tunnel and Terry Tunnel <br /> bulkheads . Please contact me if this is not the case or if you <br /> have any questions on the submittal . SGC anticipates a meeting <br /> will be required with the Division to discuss the joint <br /> presentation to the Board for a determination as to the Board 's <br /> position on the continuing discharge issue. Finalization of any <br /> issues outstanding with this TR-14 submittal could also be <br /> accomplished at that time. <br /> Sincerely, <br /> Larry Perino <br /> Superintendent-Technical Services <br /> enclosures <br /> cc: Patricia Nelson - CDH w/enclosures <br /> LP/cjm <br />