Laserfiche WebLink
•L <br /> 1 <br /> must be submitted to, and approved by, the Division prior to <br /> closing the American Tunnel by-pass valve. Certifications <br /> described in item 4 must similarly be submitted and approved. <br /> Monitoring of the rise of the mine pool after bulkhead completion <br /> must be correlated with on-going monitoring of potential discharge <br /> points and groundwater tracer studies and reported to the Division <br /> in a comprehensive manner with the Sunnyside Mine annual report. <br /> If any discharge of mine water is detected in the course of the <br /> monitoring, or if any other problems related to flooding of the <br /> workings develops, the Division must be notified immediately so <br /> that remedial actions can be implemented. This should not be <br /> construed to mean that immediate action cannot be taken by <br /> Sunnyside Mine personnel if, in their own best judgment, the <br /> situation warrants such action. <br /> 6. Public Notification and Filing with the County Clerk <br /> The installation of bulkhead seals within the Sunnyside Mine <br /> workings has the potential to impact surrounding landowners, <br /> downstream water users, as well as the citizens of San Jaun County <br /> and the State of Colorado. For this reason the Division believes <br /> that public notice, similar to that required for new permit <br /> applications and amendments, should be provided for this technical <br /> revision. Prior to the decision date for this revision, the <br /> following notice should be published once in a newspaper of general <br /> circulation in the locality of the mining operation: <br /> PUBLIC NOTICE <br /> Sunnyside Gold Corp. , An Echo Bay Company; (Address and Phone) <br /> has filed a technical revision <br /> to their Mining and Reclamation permit with the Colorado Mined <br /> Land Reclamation Board under the provisions of the Mined Land <br /> Reclamation Act. The mine is known as the Sunnyside Mine and <br /> is located at or near Section Township Range <br /> -41 Prime Meridian— <br /> The revision proposes the placement of four reinforced <br /> concrete bulkheads to impound water currently passing through <br /> the Sunnyside Mine workings. The purpose of these bulkheads <br /> is to restore the pre-mining hydrology as best as possible to <br /> that present prior to mining. Additional information and <br /> tentative decision date may be obtained from the Division of <br /> Minerals and Geology, 1313 Sherman Street, Room 215, Denver, <br /> Colorado 80203 (303) 866-3567, or the San Jaun County Clerk <br /> and Recorder; (Clerk and Recorder's Address) <br /> or the above named mine operator. <br /> Written comments must be received by the Mined Land <br /> Reclamation Board by 5:00 p.m. on , 19_. <br /> (THE FINAL DATE FOR RECEIVING COMMENTS IS 10 DAYS AFTER THE <br /> DATE OF PUBLICATION) . <br /> In addition, this same notice should be mailed or personally served <br /> 5 <br />