Laserfiche WebLink
Scraper Worksheet Cont'd Task # 001 Page 2 of 2 <br />Cycle Time: <br />Scraper Loading Time: <br />Maneuver and Spread Time: <br />Job Condition Correction: <br />0.90 Minutes <br />0.60 Minutes <br />Site Altitude: 7600 feet <br />Net Correction: 0.797 NA <br />Travel Time: <br />Road Condition: Rutted dirt, little maintenance, no water, 2" tire penetration 5.0 <br />Haul Route: <br />Seg # <br />Scraper <br />Push Dozer <br />Source <br />Altitude Adj: <br />0.960 <br />NA <br />(CAT HB) <br />Job Efficiency: <br />0.830 <br />NA <br />(CAT HB) <br />Net Correction: 0.797 NA <br />Travel Time: <br />Road Condition: Rutted dirt, little maintenance, no water, 2" tire penetration 5.0 <br />Haul Route: <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />( %) <br />Roll. Res <br />( %) <br />Total Res <br />( %) <br />Velocity (fpm) <br />Travel Time <br />(min) <br />1 <br />1000.00 <br />5.00 <br />5.00 <br />10.00 <br />1068 <br />0.97 <br />Haul Time: 0.97 minutes <br />Return Route: <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />( %) <br />Roll. Res <br />( %) <br />Total Res <br />( %) <br />Velocity (fpm) <br />Travel Time <br />(min) <br />1 <br />1000.00 <br />-5.00 <br />5.00 <br />0.00 <br />2921 <br />0.44 <br />Return Time: <br />Total Scraper team cycle time: <br />Adjusted for job conditions: <br />Selected Number of Scrapers: <br />Adjusted single scraper team (unit) hourly production: <br />Adjusted multiple scraper team (fleet) hourly production: <br />Unadjusted unit production/hour: 777.32 LCY/Hour <br />Optimal Number of Scrapers per push dozer: <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) Total job time: <br />Unit cost: $0.884 /LCY Total job cost: <br />0.44 <br />minutes <br />2.91 <br />minutes <br />619.52 <br />LCY/Hour <br />2 <br />Scraper(s) <br />619.52 <br />LCY/Hour <br />619.52 <br />LCY/Hour <br />72.48 Hours <br />$39.704.16 <br />CIRCES Cost Estimating Software <br />