My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-06-01_REVISION - C1981012 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981012
>
2012-06-01_REVISION - C1981012 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:59:02 PM
Creation date
6/4/2012 10:30:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
Revision
Doc Date
6/1/2012
Doc Name
Adequay Review & Cost Estimate
From
DRMS
To
New Elk Coal Company, LLC
Type & Sequence
TR65
Email Name
ZTT
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 2 <br />Task description: <br />Site: New Elk Mine <br />PROJECT IDENTIFICATION <br />User: ZTT <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />Task #: 001 State: Colorado <br />Date: 5/24/2012 County: L as Animas <br />SCRAPER TEAM WORK <br />Permit Action: TR65 <br />Permit/Job #: C1981012 <br />Abbreviation: None <br />Filename: C012 -001 <br />- Scraper: Cat 627G <br />- Dozer: NA <br />COSTShift basis: 1 per day <br />Support Equipment -Load Area: <br />NA <br />-Dump Area: <br />NA <br />Road Maintenance —Motor Grader: <br />NA <br />-Water Truck: <br />NA <br />Cost Breakdown: Scraner Work Team Sunllort EmIinment Maintenance Eauipment <br />Total work team cost/hour: $547.82 <br />MATERIAL QUANTITIES <br />Initial volume: 39,912 CCY Swell factor: 1.125 <br />Loose volume: 44,901 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Scraber Bowl (volume) Basis <br />Material weight: <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ownership cost/hour: <br />$68.13 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operating cost /hour: <br />$180.83 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour: <br />$24.95 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />$273.91 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Number of Units: <br />2 <br />0 <br />0 <br />0 <br />0 <br />0 <br />Group Subtotals: <br />Work: <br />$547.82 <br />Support: <br />$0.00 <br />Maint: <br />$0.00 <br />Total work team cost/hour: $547.82 <br />MATERIAL QUANTITIES <br />Initial volume: 39,912 CCY Swell factor: 1.125 <br />Loose volume: 44,901 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Scraber Bowl (volume) Basis <br />Material weight: <br />2,550 lbs/LCY <br />Material description: <br />Earth - Dry packed <br />Rated Payload: <br />52,800 pounds <br />Payload Capacity: <br />20.71 LCY <br />Struck Volume: <br />15.70 <br />LCY <br />Heaped Volume: <br />22.00 <br />LCY <br />Average Volume: <br />18.85 <br />LCY <br />Adjusted Capacity: <br />18.85 <br />LCY <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.