Laserfiche WebLink
YOAST MINE <br />Phase 1 Bond Release Cost Summary Estimate <br />(based on Bond Recalculation 01/11/2012) <br />I <br />2012 <br />Task No. Task Description <br />Current Cost <br />2012 <br />Phase I <br />Request <br />02A <br />Grade Valora Pit N/S Highwall <br />$55,926.55 <br />$55,926.55 <br />02B <br />Grade Valora Pit E/W (Scraper Pit) Highwall <br />$6,932.15 <br />$6,932.15 <br />02F <br />Grade Neck Pit Highwall <br />$1,583.57 <br />$1,583.57 <br />03A <br />Grade Valora Pit N/S Spoil Ridges <br />$20,230.89 <br />$20,230.89 <br />03B <br />Grade Valora Pit E/W (Scraper Pit) Spoil Ridges <br />$3,538.79 <br />$3,538.79 <br />03F <br />Grade Neck Pit Spoil Ridges <br />$807.94 <br />$807.94 <br />04A <br />Grade Remaining Valora Pit N/S Spoil Ridges <br />$21,038.83 <br />$21,038.83 <br />04B <br />Grade Remaining Valora Pit E/W (Scraper Pit) Spoil Ridges <br />$22,396.18 <br />$22,396.18 <br />005 <br />Grade Drill Pads Associated with MR -18 <br />$966.57 <br />$966.57 <br />010 <br />Rip Permanent Roads <br />$3,534.00 <br />$3,534.00 <br />011 <br />Rip Haul Roads <br />$14,641.00 <br />$14,641.00 <br />012 <br />Rip Facilities Area <br />$2,524.00 <br />$2,524.00 <br />013 <br />Rip Explosives Area <br />$1,868.00 <br />$1,868.00 <br />014 <br />Rip Final Regraded Areas <br />$10,097.00 <br />$10,097.00 <br />018 <br />Narrow Permanent Roads <br />$4,672.54 <br />$4,672.54 <br />019 <br />Grade Permanent Roads to Blend <br />$4,049.00 <br />$4,049.00 <br />020 <br />Grade Haul Roads to Blend <br />$9,268.00 <br />$9,268.00 <br />021 <br />Grade Light Use Roads <br />$1,219.00 <br />$1,219.00 <br />022 <br />Regrade Access Road to Drill Pad #2 from MR 18 <br />$366.80 <br />$366.80 <br />023 <br />Regrade Temporary Access Road to Pond 010 <br />$516.97 <br />$516.97 <br />024 <br />Grade Haul Road Surface Material into Fill <br />$21,766.80 <br />$21,766.80 <br />025 <br />Grade Facilities Area Surface Material into Fill <br />$2,667.09 <br />$2,667.09 <br />028 <br />Finish Grade All Areas <br />$4,419.00 <br />$4,419.00 <br />030 <br />Regrade Pond 010 <br />$14,102.80 <br />$14,102.80 <br />031 <br />Regrade Pond 011 <br />$7,887.22 <br />$0.00 <br />032 <br />Regrade Pond 012 <br />$25,130.24 <br />$0.00 <br />033 <br />Regrade Pond 014 <br />$13,991.85 <br />$13,991.85 <br />034 <br />Regrade All Ditches <br />$1,652.00 <br />$1,652.00 <br />035 <br />Construct Post - Mining Drainage Channels <br />$186,319.47 <br />$186,319.47 <br />036 <br />Regrade Pond O11A <br />$7,477.28 <br />$0.00 <br />037 <br />Regrade Pond 012A <br />$11,678.70 <br />$0.00 <br />040 <br />Replace Topsoil from Stockpile A to Pond 010 <br />$34,253.84 <br />$0.00 <br />041 <br />Replace Topsoil from Stockpile B to Shop Area <br />$25,895.79 <br />$0.00 <br />043 <br />Replace Topsoil from Stockpile H to Neck Pit <br />$49,789.13 <br />$0.00 <br />044 <br />Replace Topsoil from Stockpile I to Entrance Road and Wadge <br />$95,143.85 <br />$0.00 <br />046 <br />Replace Topsoil from Stockpile L to Unreleased Pond 012 Area <br />$121,619.23 <br />$0.00 <br />049 <br />Replace Topsoil from Stockpile P to Pond 013 Slide Area <br />$59,378.09 <br />$0.00 <br />052 <br />Replace Topsoil from Stockpile to Mr -18 Drill Pads <br />$560.80 <br />$0.00 <br />053 <br />Replace Topsoil from Stockpile to MR -18 Access Road <br />$212.82 <br />$0.00 <br />054 <br />Replace Topsoil from Stockpile to Pond010 Access Road <br />$203.82 <br />$0.00 <br />060 <br />Seal All Monitoring Wells and Exploration Holes <br />$57,404.73 <br />$0.00 <br />063 <br />Demolish and Remove All Structures <br />$147,474.95 <br />$146,240.15 <br />065 <br />Drill Seed Mix 1 <br />$73,226.68 <br />$0.00 <br />066 <br />Drill Seed Mix 2 <br />$11,394.98 <br />$0.00 <br />