My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001-06-08_REPORT - M1977378 (2)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1977378
>
2001-06-08_REPORT - M1977378 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2021 4:20:40 PM
Creation date
6/1/2012 11:00:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
REPORT
Doc Date
6/8/2001
Doc Name
MLR Annual Report
From
Sunnyside Gold Corp
To
DMG
Permit Index Doc Type
Annual Fee/Report
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Site Reclamation Activity <br />April 2000 - March 2001 <br />Page 6 <br />was not received during the 2000 report year (a site inspection is <br />required), Table A reflects the requested release. <br />Activity at this site consisted of; <br />1) use of the quonset building, metal building and vicinity as <br />a staging area for projects and storage. <br />2) relocation of the topsoil stockpile from this area to the top <br />of Tailings Pond No.4 to prepare the area for release. <br />Activity planned for 2001 includes; <br />1) monitoring and maintenance of vegetation on the remaining area <br />if the release request is approved as submitted. If the <br />release request is not approved, correct any deficiencies <br />required for release approval. <br />BULKHEADS - TR -14 / TR -16 / TR -22 / TR -23 / TR -25 <br />Activity on this project during the 2000 reporting year consisted <br />of; <br />1) the continuation of the seep, spring and flowing adit <br />inventory required by TR -14. Twenty percent of the sites were <br />required to be sampled and all sites monitored for field <br />parameters twice. SGC monitored each site twice (if flow <br />existed) and sampled more than twenty percent of the sites <br />during the field season. Summary sheets of the data collected <br />are included in Appendix B. <br />2) implementation of the work plans for the voluntary Consent <br />Decree agreement projects in order to fulfill the terms of the <br />agreement and move towards final site reclamation if the terms <br />of the Consent Decree are successfully met. The "A List" <br />projects were completed and inspected by October 1997. <br />Sunnyside submitted three additional projects for inclusion <br />under the Consent Decree B list projects. These projects <br />include work within the permit area (approved in TR -21) as <br />well as diversion work outside the permit area. These projects <br />were started during the 1998 report year with completion in <br />the 1999 report year although repair work for approval of one <br />of these projects was completed in the 2000 report year. <br />3) monitoring of the bulkhead in the American Tunnel for pressure <br />and mine pool for pH, temperature and conductivity, and <br />inspection of the tunnels and bulkheads. <br />
The URL can be used to link to this page
Your browser does not support the video tag.