Laserfiche WebLink
Site Reclamation Activity <br />April 2000 - March 2001 <br />Page 4 <br />SUNNYSIDE BASIN (LAKE EMMA) AREA - Plate No. 2 <br />During the 2000 reporting year, no additional acreage was disturbed <br />or reclaimed. <br />Activity at the site consisted of; <br />1) refilling the area of subsidence over the Lake Emma hole back <br />to grade. The fill material was obtained from the stockpile <br />left for this purpose. <br />Planned activity for 2001 includes; <br />1) refilling to grade any subsidence of the Lake Emma backfill. <br />2) monitoring and maintenance of the planted areas. <br />TAILINGS POND No.4 - Plate No. 3 <br />During the 2000 reporting year no additional acreage was disturbed <br />or reclaimed. <br />Activity at this site consisted of; <br />1) usage for containment of material removed from the <br />American Tunnel water treatment settling ponds. <br />2) monitoring and maintenance of the vegetation. This included <br />repair work on the upland groundwater ditch approved in TR -21. <br />Early flows eroded the ditch liner cover and the liner was <br />exposed in several places. Topsoil was also spread over the <br />slope and the area was planted with the Mountain Mix specified <br />for this area. <br />Planned activity for 2001 includes; <br />1) monitoring and maintenance of the vegetation. <br />