My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001-06-08_REPORT - M1977378 (2)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1977378
>
2001-06-08_REPORT - M1977378 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2021 4:20:40 PM
Creation date
6/1/2012 11:00:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
REPORT
Doc Date
6/8/2001
Doc Name
MLR Annual Report
From
Sunnyside Gold Corp
To
DMG
Permit Index Doc Type
Annual Fee/Report
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Site Reclamation Activity <br />April 2000 - March 2001 <br />Page 10 <br />August 11, <br />The Terry Tunnel bulkhead was inspected on June 2, 2000, er gust 1 c , <br />2000 and August 24, 2000 to sample and inspect for s on August <br />according to the design. Bulkhead pressure was 39 -40 p <br />24, 2000 which reflects a pool elevation of 11,648 feet MS owhich <br />he <br />agreed with the American Tunnel gage within the accuracy n t 4, <br />gages. No problems were observed manently ugrouted shut u to start <br />2000, the bulkhead pipes were p r <br />construction of the Terry Tunnel With h completi completion of the closure, <br />reclamation of the Terry Tunnel. <br />monitoring of this site has been terminated. <br />
The URL can be used to link to this page
Your browser does not support the video tag.