Laserfiche WebLink
Site Reclamation Activity <br />April 2000 - March 2001 <br />Page 10 <br />August 11, <br />The Terry Tunnel bulkhead was inspected on June 2, 2000, er gust 1 c , <br />2000 and August 24, 2000 to sample and inspect for s on August <br />according to the design. Bulkhead pressure was 39 -40 p <br />24, 2000 which reflects a pool elevation of 11,648 feet MS owhich <br />he <br />agreed with the American Tunnel gage within the accuracy n t 4, <br />gages. No problems were observed manently ugrouted shut u to start <br />2000, the bulkhead pipes were p r <br />construction of the Terry Tunnel With h completi completion of the closure, <br />reclamation of the Terry Tunnel. <br />monitoring of this site has been terminated. <br />