My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001-06-08_REPORT - M1977378 (2)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1977378
>
2001-06-08_REPORT - M1977378 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2021 4:20:40 PM
Creation date
6/1/2012 11:00:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
REPORT
Doc Date
6/8/2001
Doc Name
MLR Annual Report
From
Sunnyside Gold Corp
To
DMG
Permit Index Doc Type
Annual Fee/Report
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Site Reclamation Activity <br />April 2000 - March 2001 <br />Page 9 <br />Other surface and groundwater sample results in the Mayflower <br />Mill area (Pond No.3 stream SCTP31 and SCTP32 and Wells EOMW1 <br />and EOMW2) were at or below levels of metals observed in the <br />past. <br />2) American Tunnel area <br />Cement Creek monitoring reflects some improvement due to <br />stream treatment. Seeps entering the stream bed between CC1 <br />and CC2 carry enough metals that CC2 quality is not the same <br />as treated effluent from the American Tunnel treatment system <br />even though basically all of the stream flow has been treated <br />from August through the end of April, since 1996 (except for <br />June 1999 g November 1999 when treatment was temporarily <br />suspended). <br />The seep ATS2, originally from the toe of the American Tunnel <br />waste dump, has maintained the level of improvement first seen <br />after completion of the waste dump reclamation. The seep ATS1 <br />appears to have disappeared or relocated due to the <br />reclamation of the waste dump. <br />3) Terry Tunnel /Lake Emma <br />Eureka Creek monitoring above the Terry Tunnel continues to <br />show the same level of improvement, as compared to previous <br />years. <br />4) Mine Pool <br />The Terry Tunnel and American Tunnel bulkhead mine pool water <br />quality samples submitted with this report reflect the quality <br />of water behind the bulkheads. <br />MONITORING - Settling, phreatic water levels and bulkhead <br />inspections <br />Included in Appendix A are settlement monitoring data for Tailings <br />Pond No.4, phreatic water level monitoring for Tailings Pond No.4 <br />and American tunnel pressure gage readings indicating depth of mine <br />pool. <br />Tailings Pond No.4 settling and phreatic level monitoring does not <br />reveal any adverse trends. The phreatic level remained low since <br />pond reduction occurred. <br />Monitoring of the bulkhead pressure gage in the American Tunnel was <br />performed more often than required by TR -14. As of March 30, 2000, <br />the pressure was 438 psi which reflects a pool surface elevation of <br />11,661 feet MSL. With some annual variation, this level reflects <br />mine pool physical equilibrium. During each monitoring visit, the <br />tunnel and bulkhead are inspected for changes. No changes have been <br />noted to -date. <br />
The URL can be used to link to this page
Your browser does not support the video tag.