Laserfiche WebLink
TAILINGS POND NO. 1 - Plate No. 3 <br />Tailings Pond No. 1 was used for solid waste storage and disposal <br />during the reporting year. <br />Planned Activity for 1992: <br />1) Earthwork portion of the reclamation plan approved in TR- <br />13 and possibly seeding in the fall if construction <br />allows. <br />TAILINGS POND NO. 2 - Plate No. 3 <br />The earthwork portion of the reclamation plan approved in TR -11 was <br />basically completed. <br />Planned Activity for 1992: <br />1) Completion of earthwork (very minor amount of work not <br />completed in 1991). <br />2) Planting of area with Mountain Mix and fertilization as <br />recommended (see Appendix). <br />ENGINEERING OFFICE SETTLING PONDS - Plate No. 3 <br />The area that was seeded in July of 1990 experienced very poor <br />germination. Soil samples were taken and it appears that there is <br />an acidity problem in this area in addition to possible problems <br />with seeding procedures as discussed in the 1991 annual report. <br />Planned Activity for 1992: <br />1) Amend as recommended and reseed. <br />MAYFLOWER MILL AREA - Plate No. 3 <br />General site cleanup was carried out. <br />Planned Activity for 1992: <br />1) Additional site cleanup. <br />WATER MONITORING <br />Included in the Appendix are; water quality monitoring data for the <br />Mayflower Mill -site area, American Tunnel Area and Sunnyside Basin, <br />data from the three CDPS Permits and phreatic water levels for the <br />wells on Tailings Pond No.4, Tailings Pond No.3 and the monitoring <br />wells down - gradient from Tailings Pond No.3. <br />