Laserfiche WebLink
Site Reclamation Activity <br /> Page 9 <br /> EUREKA STOCKPILE AREA <br /> Activity at this site consisted of a general site cleanup. The <br /> reclamation of this site according to the plan should be complete. <br /> Inspection and removal of this site from the permitted area will be <br /> requested during the 1994 reporting year. <br /> BULKHEADS - TR-14/TR-16 <br /> During the 1993 reporting year , a Technical Revision was approved <br /> to install underground bulkheads for the purpose of eliminating <br /> drainage from the Sunnyside Mine through the Terry Tunnel and <br /> American Tunnel and restoring hydrologic conditions to an <br /> approximation of pre-mining conditions. As of the end of the <br /> report year , two bulkheads had been completed of a six bulkhead <br /> program. <br /> A study to define the conjunctive flow of Cement Creek was started <br /> as a commitment for TR-14 . This study and resulting monitoring <br /> program will be completed and implemented during 1994. <br /> MONITORING - Water quality <br /> Included in the Appendix is water quality data for ; <br /> 1) Mayflower Millsite area <br /> a) Animas River above and below complex . <br /> b) Boulder Creek above and below tailings ponds. <br /> c) Monitoring wells on the banks of the Animas River down <br /> gradient from Tailings Pond #3. <br /> d ) Flow in the diversion ditch between Tailings Pond #3 <br /> and Tailings Pond #4 . <br /> 2) American Tunnel area <br /> a) Cement Creek above and below the complex . <br /> b) Springs in the area of the waste dump. <br /> 3 ) Eureka Creek between Sunnyside Basin and the Terry Tunnel. <br />