My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1998-10-26_HYDROLOGY - M1977378
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1977378
>
1998-10-26_HYDROLOGY - M1977378
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2021 4:01:43 PM
Creation date
5/31/2012 8:54:10 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
HYDROLOGY
Doc Date
10/26/1998
Doc Name
Sep. 1998 Rpt
From
Sunnyside Gold Corp
To
CDPHE-WQCD
Permit Index Doc Type
Hydrology Report
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11111111111111111111 <br /> J <br /> AL M - c 1 77—3 7? <br /> SUNNYSIDE GOLD CORPORATION <br /> AM ECHO DAY COMPANY <br /> P.O. Box 177 .Silverton, CO 81433 <br /> Phone (303) 387-5533 .Telecopy (303) 387-5310 <br /> RECEIVED <br /> October 20, 1998 <br /> Ms. Sarah Johnson �A D1 &GGEOLOGY MINERALS <br /> CDPHE - Assessment Unit .� <br /> Water Quality Control Division <br /> 4300 Cherry Creek Drive South <br /> Mail Code: WQCD-AU-B2 <br /> Denver, CO 80246-1530 <br /> RE: September 1998 Monthly/3rd Quarter Report and monthly DMRs <br /> for CDC Permit No. CO-0044768 - Mine Remediation Projects, San <br /> Juan County <br /> Dear Ms. Johnson: <br /> The following is submitted to satisfy the September monthly/3=d <br /> Quarter and DMR reporting requirements for CDPS Permit No. CO- <br /> 0044768 - Mine Remediation Projects and the related Consent <br /> Decree agreement. <br /> Project Status: <br /> "A List" Projects <br /> - American Tunnel Mine Waste Dump <br /> - Boulder Creek Tailings Project <br /> - Surface Mill Tailings at Eureka <br /> - Gold Prince - Mill Tailings <br /> - Ransom Tunnel <br /> - Longfellow - Koehler Mine Waste Project <br /> - Pride of the West Tailings <br /> These projects were completed and accepted by DMG as complying <br /> with the Consent Decree work plans and MLR Standards in 1997. <br /> Monitoring and maintenance is the only additional work planned <br /> for these sites. <br /> In September, 1998 monitoring samples were taken at the Gold <br /> Prince project site. The results from these samples are <br /> attached as well as the results from the samples taken at the <br /> Longfellow-Koehler project site in August. <br />
The URL can be used to link to this page
Your browser does not support the video tag.