My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-02-22_HYDROLOGY - M1977378
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1977378
>
1999-02-22_HYDROLOGY - M1977378
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2021 8:02:34 AM
Creation date
5/31/2012 8:54:00 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
HYDROLOGY
Doc Date
2/22/1999
Doc Name
Jan. 1999 Rpt
From
Sunnyside Gold Corp
To
CDPHE-WQCD
Permit Index Doc Type
Hydrology Report
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
January 1999 Monthly Report <br /> Page 2 <br /> ♦ Sunnyside Mine Pool Mitigation - Alkaline Solution Injection <br /> This project was not active in January 1999 . The water <br /> pool pH, at the American Tunnel bulkhead, was 4. 25 and the <br /> bulkhead pressure was 370 psi at month end. <br /> Sunnyside will continue to monitor these parameters. <br /> "B List" Projects <br /> ♦ Columbus Mine Portals -Mine Waste Dumps <br /> ♦ London Mine Portals - Waste Dumps <br /> Work, permitting or arrangement for access is not planned <br /> until it becomes evident that the work plans for these <br /> projects require implementation. <br /> ♦ Mayflower Facility - Upland Hydrological Control <br /> ♦ Tailings Pond No. 4 Surface Drainage Modification <br /> ♦ Tailings Pond No. 4 Upland Groundwater Diversion <br /> There was no activity on these projects for January 1999. <br /> It is planned to resume work on these projects in the <br /> spring of 1999. <br /> Cement Creek Diversion and Water Treatment <br /> Cement Creek diversion and water treatment was active <br /> continuously throughout January, 1999. The flow of Cement <br /> Creek throughout January was below the treatment system' s <br /> capacity and the entire flow was diverted for treatment. <br /> The flow diverted and treated in January ranged from 215 <br /> G.P.M. to 277 G.P.M. <br />
The URL can be used to link to this page
Your browser does not support the video tag.