Laserfiche WebLink
999 <br /> SUNNYSIIZE GOLD CORPORATION <br /> AN ECHO 8AY COMPANY RECEIVED <br /> P.O. Box 177 • Siiverton, CO 81433 MAY 21 1999 <br /> Phone (970) 387-5533 • Fax (970) 387-5310 <br /> f Division of Minerals&Geology <br /> M- Jg77 �37F <br /> May 19, 1999 <br /> Ms. Sarah Johnson <br /> CDPHE— Assessment Unit <br /> Water Quality Control Division <br /> 4300 Cherry Creek Drive South <br /> Mail Code; WQCD-AU-B2 <br /> RE: April 1999 Monthly Report and DMR's for CDPS Permit No. CO-0044768 —Mine <br /> Reme is ion rojects, San'Tu`anr"ounty <br /> Dear Ms. Johnson: <br /> The following is submitted to satisfy the April 1999 monthly and DMR reporting <br /> requirements for CDPS Permit No. CO-0044768—Mine Remediation Projects and the <br /> related Consent Decree agreement. <br /> Project Status: <br /> "A List" Projects <br /> • American Tunnel Mine Waste Dump <br /> • Boulder Creek Tailings Project <br /> • Surface Mill Tailings at Eureka <br /> • Gold Prince—Mill Tailings <br /> • Ransom Tunnel <br /> • Longfellow—Koehler Mine Waste Project <br /> • Pride of the West Tailings <br /> These projects were completed and accepted by DMG as complying with the Consent <br /> Decree work plans and MLR Standards in 1997. Monitoring and maintenance is the only <br /> additional work planned for these sites. <br /> Confirmation of completion by CDPHE has been received for two of these projects— <br /> Surface Mill Tailings at Eureka and Ransom Tunnel. <br />