My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-04-27_HYDROLOGY - M1977378 (2)
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1977378
>
2000-04-27_HYDROLOGY - M1977378 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2021 10:43:37 AM
Creation date
5/31/2012 8:53:38 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
HYDROLOGY
Doc Date
4/27/2000
Doc Name
American Tunnel Bulkhead Water Data
From
Sunnyside Gold Corp
To
DMG
Permit Index Doc Type
Hydrology Report
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
February 2000 Monthly Report <br /> Page 3 <br /> Cement Creek Diversion and Water Treatment <br /> Cement Creek diversion and water treatment was active throughout the month of <br /> February with the entire flow being diverted for treatment with the lower American <br /> Tunnel flow. <br /> The February 2000 monitoring results for; dissolved metals in the AT-004 discharge; <br /> Cement Creek (CC-1B); American Tunnel flow before treatment (AT-INFEL); and <br /> Cement Creek below the AT-004 discharge point (CC-20) are attached. <br /> Mainstem Stream Monitoring and Reference Point Stream Monitoring <br /> Sunnyside sampled the reference point (A-72) and the other three gaging stations (A-68, <br /> C-48 and M-34) on February 2, 2000. The results for these samples are attached. <br /> The provisional flow at A-72 on February 2, 2000 was 84 cfs, which places this sample <br /> result in the low flow category (Q<100cfs). The dissolved zinc value for this sample, <br /> obtained by averaging the results from two labs, was 611 ug/l. <br /> The index number for the February sample is calculated as follows: <br /> Xi =611 <br /> Xf= 519 <br /> Sf= 124 <br /> Ni = (Xi —Xf)/Sf <br /> Ni = (611 — 519)/124 <br /> Ni = +0.74 <br /> The index number graph and updated reporting table are attached. <br /> Evaluation of the normalized data: <br /> The index value of +0.74 for February, 2000 indicates that the dissolved zinc <br /> concentration at the reference point A-72 was higher than the mean value of the reference <br /> data for the low flow class. In comparison to the February 4, 1999 sample result, the <br /> concentration is lower (61 l ug/l verses 650 ug/1) and the flow comparable. <br />
The URL can be used to link to this page
Your browser does not support the video tag.