Laserfiche WebLink
volume of the talus slope west of the lake hole has sloughed into <br /> this hole. The ABP of this talus is +29 . 0. Water permeating the <br /> lake hole will come in contact with this net neutralizer before <br /> exiting the mine through the Terry Tunnel or American Tunnel and <br /> their respective treatment systems . <br /> - 12 - <br />