Laserfiche WebLink
Mining activity during the summer of 1988 produced a significant <br /> portion of the material needed to reclaim Lake Emma. The <br /> Materials Balance Sheet located in Appendix "C" reveals that an <br /> additional 53 ,000 cubic yards of fill will be required to <br /> complete the reclamation as planned . <br /> Sunnyside Gold is currently studying the feasibility of future <br /> mining in Sunnyside Basin. It is the opinion of Sunnyside Gold <br /> that the additional fill required will be produced through future <br /> mining operations. <br /> - 10 - <br />