My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-04-27_HYDROLOGY - M1977378
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1977378
>
2000-04-27_HYDROLOGY - M1977378
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2021 10:55:13 AM
Creation date
5/31/2012 8:53:02 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
HYDROLOGY
Doc Date
4/27/2000
Doc Name
1st Qtr 2000 Rpt
From
Sunnyside Gold Corp
To
CDPHE-WQCD
Permit Index Doc Type
Hydrology Report
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ist Quarter/March 2000 Monthly Report <br /> Page 2 <br /> Confirmation of completion by CDPHE has been received for two of these projects — <br /> Surface Mill Tailings at Eureka and Ransom Tunnel. Sunnyside has not received <br /> confirmation of completion from CDPHE for the remaining five projects although <br /> Sunnyside submitted completion certifications in October 1997. <br /> There were no progress pictures taken during the quarter due to snow-cover. <br /> • Sunnyside Mine Pool Mitigation —Alkaline Solution Injection <br /> This project was not active in March or the I" quarter of 2000. <br /> The water pool pH, at the American Tunnel bulkhead, was 5.27 and the bulkhead gage <br /> read 420 psi at the end of March. This would indicate the mine pool elevation did not <br /> change since January with very little fluctuation since October 1999. Sunnyside believes <br /> this static condition indicates that the mine pool is at physical equilibrium and will <br /> request confirmation from DMG. <br /> "B List" Projects <br /> • Columbus Mine Portals — Mine Waste Dumps <br /> • London Mine Portals —Waste Dumps <br /> Work, permitting or arrangement for access is not planned until it becomes evident that <br /> the work plans for these projects require implementation. <br /> • Mayflower Facility — Upland Hydrological Control <br /> This project was completed in October, 1999 and accepted by DMG as complying with <br /> the Consent Decree work plans and MLR Standards in November, 1999. <br /> Only the out-falls for these diversions were visible at quarter end due to snow-cover but <br /> combined flows were estimated to be more than 200 gpm. <br /> There were no progress pictures taken during the quarter due to snow-cover. <br /> • Tailings Pond No. 4 Surface Drainage Modification <br /> This project was completed in November, 1999 and accepted by DMG as complying with <br /> the Consent Decree work plan and MLR Standards. <br /> The out-fall pipe was visible and appeared to run intermittently, depending on <br /> temperature, which is what was expected because intercepted flows would only be <br /> surface run-off. <br /> There were no progress pictures taken during the quarter due to snow-cover. <br />
The URL can be used to link to this page
Your browser does not support the video tag.