My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-10-20_HYDROLOGY - M1977378
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1977378
>
1999-10-20_HYDROLOGY - M1977378
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2021 7:07:21 AM
Creation date
5/31/2012 8:52:37 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
HYDROLOGY
Doc Date
10/20/1999
Doc Name
3rd Quarter 1999 Report
From
Sunnyside Gold Corp
To
EPA
Permit Index Doc Type
Hydrology Report
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attn: Ron Zdyb <br />Mail Code: 8D2 -W -GW <br />U.S. Environmental Protection Agency <br />Underground Injection Control (UIC) <br />999 18 St., Suite 500 <br />Denver, CO 80202 -2466 <br />RE: EPA File No. CO5000- 03745, San Juan County, Colorado <br />3rd Quarter 1999 Report (July — September) <br />Dear Mr. Zdyb: <br />In accordance with the quarterly reporting requirements of EPA's June 26, <br />1996 Rule Authorization letter for injection of water and alkaline material <br />into the Sunnyside Mine, Sunnyside Gold Corporation (SGC) submits the <br />following report. This report covers the period from July 1, 1999 through <br />September 30, 1999. <br />Terry Tunnel Bulkhead <br />SUNNYSIDE GOLD CORPORATION <br />AN ECUO DAY COMPANY <br />P,O. Box 177 • Silverton, CO 81433 <br />Phone (970) 387 -5533 • Fax (970) 387 -5310 <br />b&Q II I lIlIlIlI 111 <br />RECEIVED <br />1999 <br />Division of Minerals & Geology <br />The Terry Tunnel bulkhead was inspected on July 26, 1999 and September <br />28, 1999. During these inspections pressure gage readings were taken. The <br />pressure reading on July 26 did not agree with the American Tunnel gage <br />and did not appear feasible therefore another gage was obtained. Using the <br />new gage on September 28t1,, the pressure reading was 20 psi which agrees <br />with the American Tunnel gage within the accuracy of the gages. Samples <br />were taken for field parameters during each inspection. This information is <br />
The URL can be used to link to this page
Your browser does not support the video tag.