Laserfiche WebLink
Activity planned for 1991 consists of trying to correct the <br /> problems being experienced with establishing vegetation on this <br /> site. <br /> Mayflower Mill Area - Plate No. 3 <br /> Activity at this site consisted of : _ <br /> (1) Improvement to site drainage containment system. Drainage <br /> structures were installed to divert runoff from the site <br /> into the spill containment pond where it then flows to <br /> Tailings Pond #4 . <br /> (2) The spill-containment pond was completely excavated and then <br /> lined with a bentonite-earth mixture to prevent seepage. <br /> Planned activity for 1991 consists of the annual site cleanup. <br /> - 6 - <br />