My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-05-29_INSPECTION - C1982056 (2)
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1982056
>
2012-05-29_INSPECTION - C1982056 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:58:14 PM
Creation date
5/30/2012 10:57:28 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Inspection
Doc Date
5/29/2012
Doc Name
Inspection Report
From
DRMS
To
Jerry Nettleton
Inspection Date
5/24/2012
Email Name
JDM
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
May 24, 2012 C -1982- 056 /Foidel Creek Mine JDM <br />GENERAL MINE PLAN COMPLANCE: <br />The longwall is currently working in the 15LT panel with the continuous miner operating in the 14LT headgate <br />area. Reclamation work has been completed at the Fish Creek Tipple Site. One ' 110 car coal train was in the <br />process of loading at the time of the inspection. <br />OTHER (SPECIFY): <br />This was a complete coal inspection of the Foidel Creek Mine conducted by Jason Musick of CDRMS. Brian <br />Watterson of TCC accompanied the inspection. The weather was clear, with a small amount of moisture <br />(rain /snow) during the inspection. <br />PROCESSING WASTE /COAL MINE WASTE PILES — Rule 4.10 and 4.11 <br />Drainage Control; Surface Stabilization; Placement: <br />Refuse material continues to be placed in the RDA expansion area. A small amount of material has been <br />stockpiled at the toe of the RDA expansion area and approximately midway in the RDA with evidence of grading <br />having been conducted during the inspection. The RDA was well compacted and stable at the time of the <br />inspection. The refuse material had not yet reached the head of the under -drain of the RDA. The exposed under - <br />drain was stable and constructed as designed. Phase 1 of the RDA expansion is nearing completion. TR67 was <br />approved with a stipulation that future bonding for each phase of construction will be required prior to the <br />initiation of the next Phase. <br />Number of Partial Inspection this Fiscal Year: 9 <br />Number of Complete Inspections this Fiscal Year: 4 <br />Page 4 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.