May 24, 2012 C -1982- 056 /Foidel Creek Mine JDM <br />Inspection Topic Summary <br />NOTE: Y= Inspected N =Not Inspected R= Comments Noted V= Violation Issued NA =Not Applicable <br />Y - Air Resource Protection <br />R -Roads <br />R - Availability of Records <br />R - Reclamation Success <br />R - Backfill & Grading <br />Y - Revegetation <br />NA - Excess Spoil and Dev. Waste <br />Y -Subsidence <br />N - Explosives <br />NA - Slides and Other Damage <br />Y - Fish & Wildlife <br />Y - Support Facilities On -site <br />R - Hydrologic Balance <br />R -Signs and Markers <br />R - Gen. Compliance With Mine Plan <br />NA - Support Facilities Not On -site <br />R - Other <br />NA - Special Categories Of Mining <br />R - Processing Waste <br />R - Topsoil <br />COMMENTS <br />AVAILABILITY OF RECORDS — Rule 5.02.4(1): <br />All records were located at the TCC office and up to date. See attached DRMS Availability of Records. <br />BACKFILL and GRADING — Rule 4.14 <br />Contemporaneous Reclamation 4.14.1; Approximate Original Contour 4.14.2; Highwall Elimination <br />4.14.1(2)(f); Steep Slopes 4.14.2, 4.27; Handling of Acid and Toxic Materials 4.14.3; Stabilization of Rills and <br />Gullies 4.14.6: <br />The completed backfilling and grading operations at the Fish Creek Tipple site were inspected. The site remains <br />stable with no evidence of erosion or instability observed. All erosion control ditches were in place with no <br />damage noted. <br />HYDROLOGIC BALANCE - Rule 4.05 <br />Drainage Control 4.05.1, 4.05.2, 4.053; Siltation Structures 4.05.5, 4.05.6; Discharge Structures 4.05.7, <br />4.05.10, Diversions 4.05.4, Effluent Limits 4.05.2; Ground Water Monitoring 4.05.13; Surface Water Monitoring <br />4.05.13; Drainage — Acid and Toxic Materials 4.05.8; Impoundments 4.05.6, 4.05.9; Stream Buffer Zones 4.05.18: <br />Ponds B, C, D, E, F, G, 6NM, 18LT, 6NM sediment pond, the Fish Creek borehole ponds, the Fish Creek Tipple <br />pond and the Pit Pond were observed during the inspection. Discharge was noted at Pond D. All other ponds <br />were not discharging. All pond embankments were well vegetated and stable with no problems noted with the <br />exception of the following: <br />- The sediment sump located on the northwest corner of pond B was receiving heavy run -off from the trick load <br />out access road. In order to alleviate the amount of water entering the sump, TC has breached an area on the north <br />end of pond B. Runoff water is entering pond B at the breached inlet. No discharge was noted at pond B at the <br />time of the inspection. This repair work will need to be addressed and cleaned up to provide additional protection <br />from erosion.. If design changes to pond B are implemented or additional culverts installed, a revision to the <br />Division is required to be approved before work begins. In addition, the inlet to the sediment sump displays heavy <br />erosion; this area should be cleaned up and stabilized as the erosion is cutting into the Pond B access road. <br />Number of Partial Inspection this Fiscal Year: 9 <br />Number of Complete Inspections this Fiscal Year: 4 <br />Page 2 of 8 <br />