My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1987-12-01_PERMIT FILE - C1981017 (199)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981017
>
1987-12-01_PERMIT FILE - C1981017 (199)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2021 2:58:51 AM
Creation date
5/24/2012 3:01:47 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
PERMIT FILE
Doc Date
12/1/1987
Doc Name
Estimated Reclamation Cost Calculations Table of Contents
Section_Exhibit Name
Chapter V Appenidx V-D-1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EARTHWORK ESTIMATING - TRUCK/LOADER TEAMS <br /> r � <br /> TASK--DESCRIPTION: <br /> -------------- <br /> HOURLY EQUIPMENT COST: <br /> t Truck make and model <br /> Loader make and model FI 6 <br /> adjusted Operator Cost Per Hour <br /> hours days base base shift total <br /> shift per per rental operating wage overtime premium equip. <br /> no. day week rate/hr. cost/hr rate/hr adjustment adj. <br /> NIA es- <br /> NIA <br /> 1 S O <br /> 2 <br /> 7 ' <br /> 3 total truck cost/hr. = , s 7. os <br /> ' total_ loader cost/hr. = S iyo. did <br /> c /hr. divided by / shifts/day = E 9 . average truck cost/hr. <br /> $ hr. divided by �_ shifts/day = $ , jrO, pC average loader cost/hr. <br /> MATERIAL QUANTITIES: <br /> Bank volume BCY x swell factor = G' y"oo v LCY <br /> Verification methods used �,�.,,, <br /> HOURLY PRODUCTION: ft. altitude = 8co ft. <br /> Haul distance = oo-o ft. , return distance = Ya o o <br /> Total resistance au a % rolling res. plus% grade res. +or- = o % <br /> Total resistance (return) •.Z rolling res. plus ,� % grade res. (+or-)= �_% <br /> Note: for grade resistance, (+) = unfavorable, favorable (downhill ) <br /> Truck capacity LCY (nominal heaped) bucket fill factor from <br /> Loader capacity = '7 . LCY (nominal heaped) x .9 J Y/bucket load (adj. cap <br /> fill factor adjustment table in Section VII = <br /> No. of loader passes required to fill truck = J (round to nearest whole no. ) <br /> Adjust truck capacity = 42- LCY <br /> Loader cycle time: basic cycle oad, maneuver and dump) = O- min. <br /> 1st pass = 0.1 min (bulk of 1st pass completed -during truck exchange time) <br /> 2nd ---------- o• S no n <br /> 3rd ---------- 6 :n min Loader cycle corrections: <br /> 4th ---------- min <br /> Sth ---------- min <br /> 6th ---------- min <br /> min total load time <br /> Truck cycle time: Exchange time ---------- •7 min. <br /> Load ------------------- �- <br /> Haul ------------------- <br /> Maneuver at dump ------- •-7 <br /> Dump ------------------- <br /> Return ----------------- - <br /> 3 0 r ...;., �...,. .. <br />
The URL can be used to link to this page
Your browser does not support the video tag.