Laserfiche WebLink
REVEGETATION SUCCESS STANDARD <br /> MINE BENCHES/DOWNSLOPES <br /> Mire Benches and Roads (19A) <br /> Physical testing has been completed (9/82) on the proposed <br /> topsoil source (beaver ponds near #3 mine) and a complete report <br /> including quantity and quality will be presented before July 1, <br /> 1983 . The mine benches and associated light use and access roads <br /> will utilize the revegetation success standard established by the <br /> baseline data collection results obtained from adjoining areas. <br /> A map will be developed by July 1, 1983 designating which <br /> part of each mine bench, and or road, corresponds with which type <br /> of reference (adjoining) area. <br /> Mine Bench Downslopes (19B) <br /> Vegetation analysis, as outlined in the attached Scope of <br /> Work (page 12 .1) will be started in 1983 to develop a revegetation <br /> success standard for the mine bench downslopes. A plan will be <br /> submitted within two years of permit issuance for revegetation of <br /> the downslopes based upon the success standard developed by the <br /> analysis. <br /> (Stipulation 19) <br /> 12 (Vol. 6, Sec. III-H) <br />