My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1987-12-01_PERMIT FILE - C1981017 (217)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981017
>
1987-12-01_PERMIT FILE - C1981017 (217)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2021 3:40:30 AM
Creation date
5/24/2012 9:38:23 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
PERMIT FILE
Doc Date
12/1/1987
Doc Name
Soil Testing Sources and Methods
Section_Exhibit Name
Chapter III Appendix III-G-1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COAL BASIN MINE PERMIT APPLICATION <br /> MID-CONTINENT RESOURCES , INC . <br /> CARBONDALE , COLORADO <br /> APPENDIX III-G-1 <br /> SOIL TESTING SOURCES AND METHODS <br /> A Class IV equivalent soil survey was conducted in the <br /> summer of 1980 in Coal Basin, which is situated some four <br /> miles west of Redstone, in Pitkin County, Colorado . <br /> The survey was conducted by SOLTESCO , P . 0 . Box 3547 , <br /> Grand Junction, CO 81502, under the direction of Dan <br /> Champion (Certified Soil Scientist) . <br /> Areas which are and will remain undisturbed by the mine <br /> operations were evaluated using reconnaisance soil aerial <br /> mapping techniques . <br /> Disturbed areas were evaluated by "ground-truth" field <br /> surveys and soil laboratory analyses . The detailed soil <br /> surveys include: <br /> - Evaluation of the future coal refuse disposal area <br /> and the rock tunnel disposal area <br /> - Soil tests from portal platforms and random samples <br /> from within the permit area . <br /> SOLTESCO also took soil samples in the rock tunnel <br /> portal area in September , 1979 in preparation for face-up <br /> work on that project . <br /> Fourteen soil samples were taken at this time for <br /> analysis . At each point , about 6 core samples were taken to <br /> the depth of the restricting boulder layer and combined to <br /> -21- <br />
The URL can be used to link to this page
Your browser does not support the video tag.