My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-01-30_PERMIT FILE - C1996083A (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1996083A
>
2012-01-30_PERMIT FILE - C1996083A (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:48:05 PM
Creation date
5/16/2012 8:52:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
1/30/2012
Doc Name
pages 2.05-84 to 2.05-165
Section_Exhibit Name
2.05 Operation and Reclamation Plans Part 2
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Iron Point Gulch will be monitored quarterly at the designated downstream <br />monitoring location shown on Map 9. Field parameters will be measured <br />each quarter. A full suite sample will be obtained semi - annually during the <br />second and fourth quarters. <br />The North Fork of the Gunnison River will be monitored quarterly at the <br />designated upstream and downstream monitoring locations shown on Map 9. <br />Field parameters will be measured each quarter except flow will not be <br />estimated. Base flow for the river will be obtained from the USGS Somerset <br />water stage recorder. The gaging station is located in the SE3SW3 of <br />Section 10, Township 13 South, Range 90 West in Gunnison County <br />approximately 2.3 miles east of Somerset and 4.8 miles upstream from <br />Hubbard Creek. The recorder is located on the south bank of the river <br />across from the reclaimed Hawksnest Silos. The gage is a water -stage <br />recorder with satellite telemetry. A full suite sample from List 1 will be <br />obtained semi - annually during the second and fourth quarters. During <br />August of each year a sample will be obtained and analyzed for the <br />parameters on List 2.. <br />Stephens Draw will be monitored quarterly at the designated upstream and <br />• downstream monitoring locations shown on Map 9. Field parameters will be <br />measured each quarter. A full suite sample from List 1 will be obtained semi- <br />annually during the second and fourth quarters. <br />Gulches A, B, C, & D will be monitored quarterly at the designated upstream <br />and downstream monitoring locations shown on Map 9 except A-Gulch does <br />not have an upstream monitoring point. Field parameters will be measured <br />each quarter. A full suite sample from List 1 will be obtained semi - annually <br />during the second and fourth quarters. <br />West Terror Creek (SW -1 and SW -4) will be monitored quarterly for field <br />parameters. A full suite sample from List 1 will be obtained semi - annually <br />during the second and fourth quarters. <br />Upstream and Downstream Stevens Gulch (SW -11 & SW -5) will be <br />monitored quarterly for field parameters. A full suite sample from List 1 will <br />be obtained semi - annually during the second and fourth quarters. <br />• <br />PR -12 2.05-118 07/10 <br />�9 �PRavED <br />
The URL can be used to link to this page
Your browser does not support the video tag.