My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-01-30_PERMIT FILE - C1996083A (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1996083A
>
2012-01-30_PERMIT FILE - C1996083A (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:48:05 PM
Creation date
5/16/2012 8:52:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
1/30/2012
Doc Name
pages 2.05-84 to 2.05-165
Section_Exhibit Name
2.05 Operation and Reclamation Plans Part 2
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The following fourteen drill holes will be monitored: DH -15, DH -25, DH -38, <br />DH -39, DH -49, DH -65, DH -67B, DH -67D, DH- 67Abv, DH- 6713Iw, TC -03- <br />01(B), TC- 03 -02, 2010 -1, CWI- DH -58, CWI- DH -60. Depending on weather <br />conditions, the first quarter monitoring event may be delayed until April or <br />May. Field parameters will be measured each quarter. A full suite sample <br />will be obtained semi - annually during the second and fourth quarters. <br />• <br />n <br />U <br />The Deer Trail Ditch will be monitored at the designated upstream and <br />downstream monitoring locations (designated "DTD" on Map 9). Field <br />parameters will be measured each quarter. A full suite sample from List 1 <br />will be obtained semi - annually during the second and fourth quarters. During <br />August of each year a sample will be obtained and analyzed for the <br />parameters on List 2. <br />Hubbard Creek and Terror Creek will be monitored quarterly at the <br />designated upstream and downstream monitoring locations shown on Map 9. <br />Field parameters will be measured each quarter. A full suite sample from <br />List 1 will be obtained semi - annually during the second and fourth quarters. <br />Hubbard Creek and Terror Creek flow will be measured at the upstream and <br />downstream monitoring locations by the USGS. The stream gaging stations <br />are to be installed by the USGS during 2001 under a cooperative (cost <br />sharing) agreement between the Operator, Delta County and the USGS. <br />The Fire Mountain Canal will be monitored 3 times per year during May, July <br />and September at the designated upstream and downstream monitoring <br />locations shown on Map 9. Field parameters will be measured during each <br />monitoring event. A full suite sample from List 1 will be obtained semi- <br />annually during the first and third monitoring event. <br />Freeman, Sheep Corral, Stevens and Dove Gulches will be monitored <br />quarterly at the designated upstream and downstream monitoring locations <br />shown on Map 9. Field parameters will be measured each quarter. A full <br />suite sample from List 1 will be obtained semi - annually during the second <br />and fourth quarters. <br />PR -12 2.05-117 11/10 <br />PPP, ovC6 <br />111!6/10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.