Laserfiche WebLink
STORM ILITVERTS <br /> Three prcposed storm culverts will cross the haul road as shown on <br /> plans. These 3 culverts are a= the following locations: <br /> 1. :+mine Pad 1 <br /> 2. Mine Pad 2. <br /> 3. Pad 4 (Lumber Yard) <br /> Bedding details shown on Plate 3 for placement of storm sewer apply <br /> to culvert placement. <br /> These culverts are in addition to the 17 culverts recommended for <br /> the haul road system. <br /> EARTH BE&;1S AT MINE nIGTRALLS <br /> Separation of overland flows developed on undisturbed areas from the <br /> runoff on the Nine Pad areas is accomplished by constructing 1 to 2 feet <br /> hion earth berms at the toe of the highwall (Plate 3) . <br /> -7- <br /> 31 <br />