My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1987-12-01_PERMIT FILE - C1981017 (110)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981017
>
1987-12-01_PERMIT FILE - C1981017 (110)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2021 12:56:57 AM
Creation date
5/15/2012 10:20:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
PERMIT FILE
Doc Date
12/1/1987
Doc Name
Mine Portal Areas
Section_Exhibit Name
Chapter II Attachment 1 to Appendix II-B-7
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DESIGN RrCOK.EITDATZONS <br /> GENERAL <br /> General design criteria described in the previous M-R report, <br /> November 16, 1979, on Sediment and Drainage Control Stnuctures at Mines <br /> 3, 4, and 5 applies to the required sediment and draLnage structures for <br /> Mines 1 and 2. <br /> Design details are shown in Plates 1, 2, and 3 attached to this report. <br /> The sedimentation and drainage control structures a: .lines Number 1 <br /> and Number 2 include the following: <br /> 1. Storm Sewer System <br /> 2. Sedimentation Pond <br /> 3. Storm Culverts <br /> 4. Earth Berms at Mine Highwalis. <br /> STORM SEWER SYSTEM <br /> Sediment and runoff from the pads at Mine 1 and Mine 2 wi11 be collected <br /> and conveyed to sedimentation pond 1 via a 12-inch diameter corrugated metal <br /> (CKP) or plastic vinyl chloride (PVC) pipe and surface ditch storm sewer <br /> system. (Plate 1 and 2) <br /> The 12-inch storm sewer will be 1120 feet long and will be buried at <br /> a 5 foot depth to a 10 per cent invert grade. The centerline of this storm <br /> sewer will be offset 5 feet from the down sloae edge of the haul road. <br /> Sediment and runoff from dine 1 enters the storm: sewer at station <br /> 116 + 20 at a concrete intake structure. This structure includes a grate <br /> to prevent large rock (+2 inch diameter) and debris from entering the <br /> sewer. <br /> -5- <br /> 29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.