My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1987-12-01_PERMIT FILE - C1981017 (107)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981017
>
1987-12-01_PERMIT FILE - C1981017 (107)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2021 12:39:59 AM
Creation date
5/15/2012 9:23:16 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
PERMIT FILE
Doc Date
12/1/1987
Doc Name
New Coal Refuse Disposal Facility
Section_Exhibit Name
Chapter II Appendix II-B-5 (Part 2 of 2)
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MI .-CONTINENT RESOURCES, 614C. <br /> PRODUCERS OF THE FAMOUS COAL BASIN COKING COAL <br /> BOX 158 <br /> CARBONDALE, COLORADO 81623 <br /> J-CONTINENT RESOURCES INC TELEPPIONE <br /> DL AINFIELD ROAD-SUITE M- (JOJI%}25e1 <br /> LOWSROOK.ILLINOIS GM21 <br /> TWIt <br /> July 13, 1984 91022116094 <br /> TLX <br /> 45-W71 <br /> Mr. Jim Herron <br /> Mined Land Reclamation Division <br /> 1313 Sherman Street <br /> Denver, Colorado 80203 <br /> Re: New Coal Refuse Pile (Sutey) <br /> Dear Jim, <br /> Following are the answers to your first draft of the critique of our refuse <br /> application. <br /> Geo-Hydro is addressing Items 2, 3, 4, 5, 6, 7 and 12. <br /> 1. All CMP culvert will be 18" or larger. <br /> 8. Enclosed are three copies of II-B-1 and II-B-2d. <br /> 9. Topsoil: 12 to 18 inches will be placed on the north and east slopes; <br /> 18 to 24 inches will be placed on the west slopes; <br /> 24 to 30 inches will be placed on the south slopes. <br /> 10. Reclamation Cost Estimate <br /> A. Facilities Removal <br /> Phase I Conveyor 5071 $ 1,521 <br /> Phase II Conveyor 1,4501 - 4,350 <br /> One Transfer point 150 <br /> 1801 of 101 tube (over Coal Creek) old No. 4 Mine tube 540 <br /> Bents or trusses I (12) 811 ? <br /> Bents or trusses II (100) 2t1 ? <br /> (9) 81► <br /> B. Sediment Pond removal - two ponds $ 1,367 <br /> C. Topsoil replacement - 10.81 Ac. $ 10,810 <br /> D. Revegetation <br /> Mulch - 2 tons/Ac. $ I50 <br /> Mulch spreading 36 <br /> Fertilization 40 <br /> Seed 200 <br /> Hand seeding 30 <br /> 456/Ac @ 10.81 Ac.$ 4,929 <br /> TOTAL ? <br /> 106 <br />
The URL can be used to link to this page
Your browser does not support the video tag.