Laserfiche WebLink
The new coal refuse diannual =Tee U-- L___ _ _ :ed <br /> � c tf V <br /> as outlined in Appendix II-B-S i j=pou4 Vao9i� 7 �. <br /> No detailed reclamation plan has 1?15C-z4'AVt7'I0 <br /> pile because no reclamation can 1 <br /> permit period . The general recli <br /> a. The pile configure <br /> changes are required for reclamation. <br /> b . Reclamation shall include the removal of temporary <br /> diversion channels and sediment ponds . <br /> C . Following the first 6.5 year phase of building <br /> the pile, contemporaneous reclamation will commence. <br /> d . Permanent slopes of the developing pile (constructed <br /> as designed) shall be reclaimed by accomplishing final grading, <br /> topsoil replacement and revegetation. <br /> e. The plan calls for varying depths of topsoil to be <br /> distributed on the permanent slopes (See Soils Report in Appendix <br /> III-G-S, Volume 6) . <br /> f . Seeding and planting of the permanent slopes shall <br /> be conducted during the first normal period for favorable planting <br /> conditions, which is normally in late fall (October and November) . <br /> g . Suitable mulch and/or other soil stabilizing <br /> practices shall be used promptly on all regraded and topsoiled <br /> areas to reduce erosion and promote germination of seeds . <br /> h. A vegetation reference area has been established <br /> near the refuse disposal area . <br /> 7 . Cut and fill terraces <br /> Cut and fill terraces will remain to enhance post-mine <br /> 105 <br />