My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1987-12-01_PERMIT FILE - C1981017 (100)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981017
>
1987-12-01_PERMIT FILE - C1981017 (100)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2021 12:34:29 AM
Creation date
5/15/2012 8:35:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
PERMIT FILE
Doc Date
12/1/1987
Doc Name
Operation Plan-Permit Area
Section_Exhibit Name
Chapter IIB
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chapter II <br /> topsoil is hauled and stored in topsoil stockpiles <br /> approved by CMLRD; <br /> topsoil stockpiles are posted with TOPSOIL signs; <br /> topsoil stockpiles are seeded with a temporary <br /> cover crop to protect them from wind and water <br /> erosion; <br /> when necessary, topsoil stockpiles are protected by <br /> perimeter diversion ditches designed to convey the <br /> peak flow from the 10 year/24 hour storm event. <br /> No topsoil will be salvaged when snow is on the ground. <br /> c. Topsoil - Sutey. <br /> The main topsoil storage area is situated northwest of the Sutey pile. A berm and <br /> perimeter ditch, 8 to 10 feet from the toe, runs along the lower end of the topsoil <br /> stockpile. <br /> Topsoil storage at the conclusion of Phase I of the Sutey pileexpansion (Summer, <br /> 1987) was estimated at 45,360 + cubic yards. The estimated additional topsoil <br /> recovery from topsoil salvage as the refuse pile expands through Phase III totals <br /> 38,890 cubic yards of material. <br /> Technical Revision 8, approved August 27, 1987 for expansion of the Sutey refuse <br /> pile, allows two additional topsoil storage areas at the site. <br /> d. Topsoil - Adit/Rock Tunnel. <br /> A technical revision was approved Feb. 10, 1987 (TR-7) for further expansion of the <br /> Adit/Rock Tunnel yard area by an additional 1.7 acres (in addition to the .9 acre <br /> expansion approved in TR-6, Nov. 5, 1986), and the Adit/Rock Tunnel yard <br /> expansion was completed in 1987. <br /> In the expansion, the existing topsoil pile (1480 cu. yds.) which had been located in <br /> the designated fill area was moved and an additional 2,000 yards of salvaged topsoil <br /> went to the storage pile. <br /> As noted in Chapter G, Soils Resource Information, in areas disturbed in connection <br /> with tunnel face-up work, soil horizons have been too thin to support vegetative <br /> growth individually, and plant growth will depend on combined soil horizons. <br /> Construction of two additional sediment ponds is the only additional surface <br /> disturbance anticipated in the term of the permit. A topsoil pile is situated at the <br /> location of the tunnel ponds. <br /> 35 <br />
The URL can be used to link to this page
Your browser does not support the video tag.