Laserfiche WebLink
Roadside Portals (C1981041) PR -5 Page 21 of 80 <br />Average push distance: <br />Unadjusted hourly <br />production: <br />Materials consistency description <br />Average push gradient: 0% <br />Average site altitude: <br />100 feet <br />1,243.2 LCY/hr <br />Compacted fill or embankment 0.9 <br />4,850 feet <br />Material weight: 2,900 lbs/LCY <br />Weight description: Deco mposed rock - 50% Rock, 50% Earth <br />Job Condition Correction Factor <br />Operator Skill: <br />Material consistency: <br />Dozing method: <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />Source <br />0.750 <br />(AVG.) <br />0.900 <br />(CAT HB)) <br />1.000 <br />(GEN. ) <br />1.000 <br />(AVG. ) <br />0.830 <br />(1 SHIFT/DAY) <br />0.800 <br />(FND -RF) <br />1.000 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.793 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.3554 <br />Adjusted unit production: 441.83 LCY/hr <br />Adjusted fleet production: 441.83 LCY/hr <br />JOB TIME AND COST <br />Fleet size: 1 Dozer(s) <br />Unit cost: $0.604/LCY <br />Total job time: 290 Hours <br />Total job cost: $773.82 <br />CIRCES Cost Estimating Software <br />