Laserfiche WebLink
Page 20 of 80 <br />Task description: <br />Site: Roadside Portals <br />BULLDOZER WORK <br />ade Pond 10 <br />Permit Action: Permit Revision 5 <br />PROJECT IDENTIFICATION <br />Task #: 071 State: Colorado <br />Date: 5/1/2012 County: Mesa <br />User: SLB <br />Agency or organization name: DRMS <br />Pennit/Job #: C1981041 <br />Abbreviation: None <br />Filename: C041 -071 <br />HOURLY EQUIPMENT COST <br />Initial Volume: <br />Basic Machine: Cat D9T - 9SU <br />Swell factor: <br />1.165 <br />Horsepower: 405 <br />1,282 LCY <br />Source of estimated volume: 1986 Division Estimate <br />Blade Type: Semi - Universal <br />Attachment: 3 -shank ripper <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown <br />Utilization % <br />Ownership Cost/Hour: <br />$80.19 <br />NA <br />Operating Cost/Hour: <br />$148.12 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$38.49 <br />NA <br />Total unit Cost/Hour: $266.79 <br />Total Fleet Cost/Hour: $266.79 <br />MATERIAL QUANTITIES <br />Initial Volume: <br />1,100 <br />Swell factor: <br />1.165 <br />Loose volume: <br />1,282 LCY <br />Source of estimated volume: 1986 Division Estimate <br />Source of estimated swell Cat Handbook <br />factor <br />HOURLY PRODUCTION <br />CIRCES Cost Estimating Software <br />