Laserfiche WebLink
Page 1 of 80 <br />COST SUMMARY WORK <br />Task description: Cost Summary for Remaining Liability <br />Site: Roadside Portals Permit Action: Permit Revision 5 Permit/Job #: C1981041 <br />PROJECT IDENTIFICATION <br />Task #: 000 State: Colorado <br />Date: 5/3/2012 County: Mesa <br />User: SLB <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />003 <br />004 <br />007 <br />008 <br />020 <br />045 <br />059 <br />069 <br />070 <br />071 <br />072 <br />073 <br />074 <br />075 <br />076 <br />078 <br />092 <br />093 <br />099 <br />100 <br />101 <br />104 <br />105 <br />106 <br />107 <br />108 <br />109 <br />110 <br />112 <br />121 <br />131 <br />Backfill North Decline Area Sediment Control <br />Structures <br />DOZER <br />3 <br />3 <br />3 <br />3 <br />1 <br />3 <br />1 <br />1 <br />1 <br />1 <br />2 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />3 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />12.24 <br />$9,800.41 <br />$129.07 <br />$24,012.96 <br />$77.91 <br />$1,578.13 <br />$1,463.80 <br />$8,153.00 <br />$1,540.60 <br />$11,843.87 <br />$773.82 <br />$4,444.56 <br />$7,849.32 <br />$103.21 <br />$2,498.71 <br />$340.98 <br />$756.23 <br />$1,181.00 <br />$7,029.00 <br />$8,236.04 <br />$606.67 <br />$468.00 <br />$11,667.14 <br />$3,994.41 <br />$565.70 <br />$27,031.67 <br />$41,401.76 <br />$4,230.96 <br />$4,230.96 <br />$2,251.85 <br />$11,026.61 <br />$139,968.08 <br />Regrade South Fan Area Berm <br />DOZER <br />0.16 <br />Regrade Cameo Mine Sediment Control Structures <br />& Substation <br />DOZER <br />30.00 <br />Regrade TR -33 Drill Pad Berm <br />DOZER <br />0.10 <br />Haul Cover from CBA -2 to CRDA #1 <br />SCRAPERI <br />1.80 <br />Regrade CRDA #1 Access Road <br />DOZER <br />1.83 <br />Finish Grade Remaining Reclamation Areas <br />GRADER <br />53.81 <br />Regrade Pond 7 <br />DOZER <br />5.77 <br />Regrade Ponds 8 and 9 <br />DOZER <br />44.39 <br />Regrade Pond 10 <br />DOZER <br />190 <br />Haul Material from CBA -2 to Backfill Pond 10 <br />SCRAPERI <br />5.06 <br />Regrade Pond 11 <br />DOZER <br />29.42 <br />Push Riprap from Inlet and Outfall into Pond 013 <br />DOZER <br />0.39 <br />Regrade Pond 13 <br />DOZER <br />937 <br />Regrade CBA #1 Sump <br />DOZER <br />1.28 <br />Backfill North Decline Diversion Ditches and <br />Berms <br />DOZER <br />183 <br />Excavate Portal Area for New Drainage Channels <br />EXCAVATE <br />10.38 <br />Install Riprap in New Drainage Channels <br />NA <br />2.10 <br />Move Topsoil from Borrow Area to Roadside <br />Areas <br />SCRAPERI <br />9.38 <br />Replace topsoil at Borrow Area <br />SCRAPERI <br />0.69 <br />Replace Topsoil from Stockpile to South Fan <br />SCRAPERI <br />0.53 <br />Replace Topsoil from Stockpile 1 to North Portal <br />Area <br />SCRAPERI <br />13.29 <br />Replace Topsoil from Stockpile 3 to North Portal <br />Area <br />SCRAPERI <br />4.55 <br />Replace Topsoil from Stockpile to TR -33 Drill Pad <br />Slot <br />DOZER <br />0.71 <br />Replace Topsoil from Stockpile 2 to CRDA #1 <br />SCRAPERI <br />30.80 <br />Replace Topsoil from Stockpile 2 to CRDA #2 <br />SCRAPERI <br />47.17 <br />Strip Topsoil at CBA -2 <br />SCRAPERI <br />4.82 <br />Replace Topsoil frm Stockpile to CBA -2 <br />SCRAPERI <br />4.82 <br />Replace Topsoil from Stockpile to CBA -1 <br />SCRAPERI <br />2.57 <br />Plug and Seal Boreholes <br />BOREHOLE <br />0.00 <br />Drill Seed Upland Seed Mix on Mine Site <br />REVEGE <br />178.00 <br />Abbreviation: None <br />Filename: C041 -000 <br />CIRCES Cost Estimating Software <br />