Laserfiche WebLink
Apri130 2012 C- 1991- 078/Hasnilton Mine MLT <br />• The four culvert pipes were clear (Photo 2). <br />ROADS — Rule 4.03 <br />Construction 4.03.1(3) / 4.03.2(3); Drainage 4.03.1(4) / 4.03.2(4); Surfacing and Maintenance <br />4.03.1(5) and (6) / 4.03.2(5) and (6); Reclamation 4.03.1(7)/4.03.2(7): <br />• Roads throughout the permit area were dry and in good condition. <br />RECLAMATION SUCCESS - Rule 4.15, Rule 3: <br />• Overall, the reclamation of the site appears to be successful. Some activities, however, are <br />not yet complete, i.e. removal of the fencing surrounding the reclaimed areas. <br />• Weed control efforts, which have had significant effect, should be continued this year. <br />REVEGETATION — Rule 4.15 <br />Vegetative Cover; Timing: <br />• Spring growth at the reclaimed site of the former Pond A still appears to be dominated by <br />Russian thistle (Photo 3). <br />• At Pond B, tamarisk plants removed in 2010 are still piled at the western end of the pond <br />embankment (Photo 4). <br />Number of Partial Inspection this Fiscal Year: 6 <br />Number of Complete Inspections this Fiscal Year: 4 Page 3 of 7 <br />