My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1993-09-20_GENERAL DOCUMENTS - C1981017 (2)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
1993-09-20_GENERAL DOCUMENTS - C1981017 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2021 4:50:24 PM
Creation date
5/3/2012 9:33:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
9/20/1993
Doc Name
Vacation of Notice of Violation or Cessation Order
From
DMG
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT 1 - STEEP SLOPE RECLAMATION AT COAL BASIN <br /> Project ID Steep Methods Employed Cost/Cost Evidence of Evidence of Comments <br /> Slope per Acre DMG Vegetative <br /> Acres Monitoring for Success <br /> Reel. Success <br /> Mine 5 ANIL 1.0 1) Brushlayering(crimping $29,000/$ None, although None. See According to DMG, this method <br /> Project completed plants into the slope at frequent 29,000 the closeout Pictures. was"proven in Europe". Very <br /> in 1991 by DMG intervals) and 2)triangular flat report powerful evidence of expensive <br /> project manager areas with bunches of tree recommends that work over the long term that is <br /> Paul Krabacher tublings 3) Broadcast and/or monitoring be unsuccessful. <br /> hydroseeding done. <br /> Mine 3 Steep Slope 10.0 1)Anchoring logs parallel to the $40,000/ None. Minimal to Some logs are still present on the <br /> completed in 1995 slope with long bolts and 2) $4,000 none. See slope but vegetation is very <br /> hydroseeding pictures. minimal. <br /> Mine 4 Steep Slope 1.25 Imprinter machine lowered $8,315/ None. Minimal A significant washout on the <br /> completed in 1997. down the slope followed by $6,652 slope occurred within 1 year after <br /> hydroseeding completion. This is a huge error <br /> in steep slope reclamation. <br /> Mine 4 Steep Slope 3.9 Hydroseeding followed by $36,948/ None. Minimal. Experimental and very expensive. <br /> completed in 1997 Bonded Fiber Matrix Mat $9,474 <br /> Mine 4 Steep Slope 6.75 No slope preparation. Only $2604/ None. Minimal. Has never been successful in Coal <br /> completed in 1997 hydroseeding with tackifier $3,953 Basin. <br /> North Basin Bid ? Create small benches every 2 ? Project not yet Not yet This work was stopped by the <br /> feet on the slopes by lowering done. performed. lawsuit. In addition to being <br /> workers down on cables(up to unsafe, the benches will require <br /> 900 feet down) then bringing cutting and filling in a slope that <br /> seed and mulch in, a few bales is already at angle of repose. The <br /> at a time, by 4 wheeler on long benches will be washed out by <br /> roads to not disturb existing rains and massive snowfall. <br /> reclamation on road surface. <br /> In addition to ignoring the test plot monitoring data taken over the years, which shows worsening results over time, DMG has consistently ignored monitoring <br /> of any type and continues to try anything possible on the slopes to get success with no proven method found yet. Unfortunately, it would he extremely poor <br /> judgement on the part of the DMG to spend large sums of money "experimenting" on the steep slopes and then run out of money to do conventional <br /> reclamation in areas such as the heavily traveled confluence of Coal Creek and Dutch Creek, where reclamation is proven and will work. <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.