Laserfiche WebLink
April 26, 2012 C- 1981 - 041 /Roadside Portals MPB <br />concurs with not re- disturbing the current alignment of Coal Canyon and will propose to approve Permit Revision <br />No. 5 (PR -5) which provides the justification for leaving Coal Canyon in its present alignment and configuration. <br />Photographs of the present Coal Canyon alignment in the vicinity of Ponds 6 and Pond 10 are shown in the <br />attached photographs at the end of this inspection report. <br />TOPSOIL — Rule 4.06 <br />Removal 4.06.2; Substitute Materials 4.06.4(4); Storage and Protection 4.06.3; Redistribution 4.06.4: <br />Also with PR -5 SCC is requesting that the remaining portion of Topsoil Pile 2 at the North Portal area be left in <br />place due to guy wire anchors supporting transmission power poles buried in the remnant of Topsoil Pile 2. The <br />Topsoil Pile 2 location was inspected (see Photo No. 4). This seems to be the appropriate course of action given <br />the high cost of relocating the guy wires. The pile is stable and well vegetated; it blends into the surrounding <br />terrain reasonably well, and does not impede the drainage pattern of the surrounding terrain nor impound water. <br />DOCUMENTS RECEIVED <br />None <br />OTHER (SPECIFY) <br />Number of Partial Inspection this Fiscal Year: 7 <br />Number of Complete Inspections this Fiscal Year: 3 <br />Page 3 of 6 <br />