KUbtKI LtLHiNLY itt_ No .SU,)-yu�)-tSU,) jan . 13 , 93 15 : 13 P .03 <br /> -- Trucks(2) 2 days/18 1800 <br /> hours:(2 x <br /> 50=1600 <br /> 0—= Route/spac 1 day/8 330 <br /> e cleared hours x <br /> for 001 30-240 <br /> ponds- <br /> add 3 hours <br /> for snowfall <br /> x30=90 <br /> T rave <br /> Jo/Fro <br /> m <br /> hUaL <br /> Between <br /> ponds <br /> Draoline 4 hours to/from 1300 <br /> mine x 100 =400 <br /> 3 hours moving <br /> 3 times between <br /> pond locations+ <br /> =9 hours x 100 <br /> = 900 <br /> Trucks 2 2 hours x 2 200 <br /> trucks x 50-200 <br /> $18,380 <br /> 016 Pond' <br /> Est. time: 4 days. <br /> The uppermost pond requires cleaning. The lower two ponds do not. <br /> The dragline is required to dredge the pond. As this pond does not have a suitable <br /> area to place pond cleaninGis, the muck will have to be transported to the tunnel pile, <br /> and there spread. This requires the use of at least two trucks, which in tum dictates <br /> use of an experienced dragline operator to load material into the trucks without spillage <br /> or damage to the trucks. <br /> The road to the tunnel ponds is being kept clear of snow, as required, to allow access. <br /> Some additional work is required when the dragline is on-site to allow it to access the <br /> ponds. The dozer is required for this job. <br /> Notice of Violation C-92-041 requires clean-out of this pond by March 20, 1993. <br /> 2 <br />