Laserfiche WebLink
J <br /> Reclamation Report #1 <br /> Bruce said there is a possit,ility that MSHA will require annual training/re-training of the <br /> reclamation crew. He will talk with CIVIC training personnel as to whether they tnink it is <br /> required. <br /> D-8N Dozer Repairs <br /> The blade will be removed from the D-8N at the mine site; the machine will be taken to <br /> Grand Junction for repairs. That will entail four trips (delivery and pick-up) with the flat- <br /> bed truck. <br /> 4 <br />