Laserfiche WebLink
PCB Disposal <br /> Carbondale/Drum soil (1) 275.00 <br /> (for landfill) <br /> Mine site/capacitors 1855.00 <br /> Total: S15,739.50 <br /> Assumes 1 trip <br /> Westinghouse Electric <br /> Westinghouse Electric's bid seems to be based on landfill of the transformers at the same site, in <br /> Nevada, as Aptus, and seems to offer essentially the same Westinghouse guarantees as far as <br /> liabilities. <br /> Date of bid Area/Items Price Quoted <br /> 12/21/92 Mine site/Garb./Transformers $43800 <br /> Capacitors 52.50/ lb. <br /> (assumes less in an 780 <br /> days in storage) <br /> Assumes single tnp and pick-up at nine sire. <br /> In subsequent discussions with Westinghouse Electric, I asked them to include in the bid some additional <br /> items for disposal, and also inquired about having a staged program in which items at Carbondale and <br /> the lower elevations of the mine were removed at one time, and those transformers at higher elevations <br /> at another. This resulted in the letter of ill9/93. <br /> Date of bid Area/Items Price Quoted <br /> 1/19/93 Mine site/Cart./Transformers 558,308 <br /> 'Note: 7 transformer adoed to the 4st(drained <br /> transformer)was subsecuenhy tested anc no <br /> PC6 resioue found, so this can prooacly oe <br /> suDstracted from this quote. <br /> US-PCI <br /> US PCI had given 2 quote (although not a formal bid) which was substantially higher and contemplated <br /> that we would drain the oil from the transformers into barrels for shipping and disposal. This would have <br /> entailea purchase of barrels (estimated at 54-5,000 additional) and seemed risky as far as handling of <br /> the waste. I told the saleman he was a high bidder,and that we had concerns about other aspects of the <br /> original proposal. He has since returner with a bid which is based on having the having US PCI <br /> personnel drain the transformers at Carbondale and the mine site, then transporting the transformer <br /> carcases to the US PCI landfill in Utah. <br /> Date of bid Area/items Price Quoted <br /> 4/14/93 Carb./Mine site/ 23,214 <br /> transformers/(drained/for landfill) <br /> Carb./Mine site/Oil 5,903 <br /> (Chemical destruction) <br /> Carb./Mine Site 165 <br /> Drums soil/debris (1) <br /> On-site services 5,177.50 <br /> Transportation 7,364 <br /> Total Project Price 541,823.50 <br /> The correspondence from these respective companies is attached for review. <br /> 2 <br />